Investigating bottlenecks
Which measurement locates the bottleneck when invoices are queued?
The failure sequence shows where load and retries interact. The diagnostic plan treats measured waiting time, processing duration and business conflicts separately.
Starting point Query the same Z-161.
Assumptions for the example case
Original fictional example design: one monthly contract in EUR, positive integer usage units, a fixed tariff version per period, one invoice and one payment order, and separate correction records. Figures and quality targets are illustrative test assumptions. Tax law, multiple currencies, prorated tariff changes and debt collection are outside the scope.
Diagnose the limiting resource
Finalisation backlog and watermark contention
27.78 invoices/s determines processing duration; the invoice plus correction verifies the correct business ordering.
From signal to action
| Signal | Validation | Reaction |
|---|---|---|
| Locate the finalisation backlog | Invoices are queued despite fast usage ingestion. | Measure tariff calculations, locks and the payment queue separately. |
| Conflicts on the shared entity | Period finalisation and N-161 compete. Ingestion wins: R-161 totals 1,200 cents. Finalisation wins: R-161 totals 1,000 cents, and N-161 produces a separate 200-cent correction record after review. In either order, the 100 units are billed only once overall. | Count expected conflicts separately from technical errors. |
| Peak test profile exceeded | Month end 100,000 invoices in 3,600 s = 27.78 invoices/s | A tariff becomes computationally more complex. |
Locate the finalisation backlog
- Validation
- Invoices are queued despite fast usage ingestion.
- Reaction
- Measure tariff calculations, locks and the payment queue separately.
Conflicts on the shared entity
- Validation
- Period finalisation and N-161 compete. Ingestion wins: R-161 totals 1,200 cents. Finalisation wins: R-161 totals 1,000 cents, and N-161 produces a separate 200-cent correction record after review. In either order, the 100 units are billed only once overall.
- Reaction
- Count expected conflicts separately from technical errors.
Peak test profile exceeded
- Validation
- Month end 100,000 invoices in 3,600 s = 27.78 invoices/s
- Reaction
- A tariff becomes computationally more complex.
Locate the finalisation backlog
Measure tariff calculations, locks and the payment queue separately.
Invoices are queued despite fast usage ingestion.
Expand capacity at the actual bottleneck.
- Alternative considered
- More ingestion APIs do not accelerate invoice generation.
- Trade-off
- Measurements need a billing-period reference.
- Reassess
- A tariff becomes computationally more complex.
Terms in this step
- Locate the finalisation backlog
- Expand capacity at the actual bottleneck.
Try it yourself
Usage ingestion is fast, but invoices are queued. Which three causes do you check separately?
A hint for your attempt
Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.
Compare with a possible solution
- First part of the solution
- Measure tariff calculation time, lock waiting time during finalisation and the payment queue separately.
- Second part of the solution
- Expand only the slow stage; additional ingestion APIs do not remove an invoice-generation bottleneck.
Apply to your project
Which corresponding assumption in your project would you check first when tariff calculations become more complex?