System Design Atlas

Multi-stage request approval

08 / 10Worked example

Bottlenecks and trade-offs

Which measurement distinguishes a backlog of human tasks from a technical handover problem?

Growing numbers of open tasks may indicate limited human capacity or unclear ownership. More 409 responses may come from concurrency or a stale interface. Long-pending handovers may indicate a problem at the purchasing boundary. These are hypotheses to test with the following measurements.

Starting point Step 7 has kept conflicting and unclear results visible.

Assumptions for the example case

Illustrative design: an internal procurement request for 6,000 euros undergoes business review followed by budget review. The inclusive budget threshold is 5,000 euros. These figures are assumptions rather than operational measurements. Ordering, payment, contract law and automatic decisions are outside the scope.

From symptom to testable cause

Diagnostic path · Trace a visible version conflict to its cause

SymptomF-17 receives 409 revision_conflict.
CorrelateTask, revision, time window
ValidationRead active revision of A-17 in the same commit.
provide evidenceR-4 submission before the decision
CauseR-3 is replaced; F-17 has been cancelled.
RespondWrite no approval
Next actionReview the new task for R-4.
  • visible symptom
  • Testable cause
  • Evidence in history

A 409 explains that R-3 has been superseded and directs the reviewer to current revision R-4.

The diagnostic path leads the version conflict to a proven cause and a next action instead of a silent retry.

Conscious trade-offs

Backlogs

Reminder visible, status unchanged

Drawing attention to a task must not replace a business decision.

Trade-off
People need to actively decide or delegate tasks.
Reassess
Revisit after measured deadline violations and clarification of delegation rules.
Transfer

Outbox with deduplicated U-17

External acceptance may remain unknown after local commit.

Trade-off
pending states and reconciliation logic remain visible during operation.
Reassess
In the case of measured target failures or modified target contract.
Versioning

Conflict instead of automatic consolidation

An approval must assess a specific revision.

Trade-off
Users must check again after R-4.
Reassess
Revisit when domain rules define justified partial approvals.

Operational data for reassessment

Measuring
Task age by rule and role, 409 rate by submission path, time U-17 remains pending, outbox backlog and unauthorised decision attempts.
Evidence still required
Without real operating data, it remains unclear which bottleneck actually dominates and which target values make sense.

Terms in this step

Bottleneck
The limiting stage of a workflow that determines lead time or error rate.
Trade-off
A conscious choice with benefit, accepted disadvantage and named cause for re-evaluation.

Try it yourself

Assign three signals each to a cause hypothesis and a safe first reaction.

A hint for your attempt

A symptom alone does not establish its cause. The first response must preserve business state.

Compare with a possible solution
Old tasks
Hypothesis: lack of representation or capacity. Response: check the work list and responsibility; send reminders, do not change status.
U-17 pending
Hypothesis: target failure or lost feedback. Response: compare or repeat with U-17.
Many 409
Hypothesis: concurrent revisions or a stale interface. Response: analyse the sequence of events; do not attempt automatic approval.

Apply to your project

Which three signals would trigger different initial responses in your design?

Step 9 connects these signals with security, responsibility, and restoration.