System Design Atlas
Application system

Rail timetables and disruption information

A regional train is cancelled before departure. Passenger information must show the cancellation even if an older delay report arrives afterwards.

Follow the design
Passenger train in front of a locked track junction with orange construction site marking.

Business workflow

A regional train is cancelled before departure. Passenger information must show the cancellation even if an older delay report arrives afterwards. A regional rail line with dated services, stops and manually confirmed cancellations.

These questions are answered by the case

  • A regional rail line with dated services, stops and manually confirmed cancellations.
  • A confirmed cancellation for the same train service and operating day remains effective until an explicitly authorised newer correction exists.

These questions remain open

  • Train control, automatic connection guarantee, ticket sales and scheduling optimization.
  1. Plan the service

    The dated service and its stops are established.

  2. Update service status

    Dispatch has confirmed the cancellation.

  3. Complete the information record

    History remains available for investigation.

Workflow with tasks and outcomes

Domain subsystems and their interactions

A regional train is cancelled before departure. Passenger information must retain the cancellation even when an older delay report arrives later. The domain system map connects train service matching, version validation, status projection and report approval.

User interfaceAccess and responsibilities

Passengers read the current status and choose a connection. Dispatch confirms cancellations and corrected status. The passenger information team checks ambiguous reports. Platform operations investigates feed gaps and recovery. The timetable service supplies versioned timetables and actual-status reports.

Requests and receive feedback
Train service status APIDomain subsystems
  • Train service matching

    Links timetable, operator and operating day to one train service.

    Described in the design
  • Version validation

    Orders actual-status reports by source version and protects confirmed cancellations.

    Described in the design
  • Status projection

    Creates the current passenger view with a timestamp.

    Described in the design
  • Report approval

    Records cancellations and authorised corrections with their reasons.

    Described in the design
Train service matching, version validation, status projection and report approval form the main business workflow. A confirmed cancellation for the same service and operating day remains effective until an explicitly authorised newer correction exists.

Domain responsibilities

A regional train is cancelled before departure. Passenger information must show the cancellation even if an older delay report arrives afterwards.

Train service matching

Links timetable, operator and operating day to one train service.

Version validation

Orders actual-status reports by source version and protects confirmed cancellations.

Status projection

Creates the current passenger view with a timestamp.

Report approval

Records cancellations and authorised corrections with their reasons.

Practical examples

Original fictional design: a regional rail line with dated services, stops and manually confirmed cancellations. An actual-status report is current at age < 90 seconds; at 90 seconds its timestamp is marked stale. All figures and test targets are illustrative assumptions.