Which tests establish unique crystal ownership despite concurrency and server replacement?

The final design reuses the complete runtime topology from step 6. Test markers connect key decisions to expected results and earlier steps to revisit. The following items form a test plan; measured evidence is still outstanding.

Starting point Count server-side rule violations and provide evidence to moderation.

Assumptions for the example case

A fictional example design: one session with at most 32 players, server-authoritative movement, one-time pickup of world items, reconnection within the same session and durably confirmed rewards. Figures and quality goals are illustrative test assumptions. A shared global game world, player trading, paid items and comprehensive fraud detection are outside the scope.

Overall architecture with evidence

Runtime Architecture · Authority per session and generation

  1. 1 · Join
  2. 2 · Order inputs
  3. 3 · Simulate ticks
  4. 4 · Confirm the record
Game clientInputs + smoothing

Platform

SitzungsrouterAllocation
SpielprozessAuthoritative simulation
BelohnungsspeicherDurable records
CheckpointsWorld state
WiederanlaufkoordinatorHigher generation
Authentication serviceIdentity verification
Game client → Session routerJoin + inputs
Session router → Game clientAllocation
Session router → Game processGeneration + Session
Game process → Game clientState snapshots
Game process → Reward storeWinning record
Game process → CheckpointsWorld state
Session router → Authentication serviceCheck join authorisation
Restart coordinator → Game processHigher generation
Checkpoints → Restart coordinatorCheckpoint
Reward store → Restart coordinatorDurable records
Contention · Step 5Sequence Step 4Restarting · Step 7

The game process simulates the world; the reward datastore and checkpoints provide different durability guarantees.

State snapshots are frequent; rewards are rare. Scale the game process and durable reward datastore separately. The snapshot path avoids unnecessary journal access.

Test plan with review loops

ValidationExpected resultReturn to an earlier step
Concurrency in both ordersP-21 and P-22 send valid pickup commands for G-21 in the same tick. Test both server-side input orders: the first valid command in that order wins; the other receives already allocated. Exactly 1 crystal is awarded in total.Steps 3 and 5
Identical and changed retriesThe same input sequence for G-21 is sent twice and returns the same winning record. The same sequence with a different item identifier is rejected as a protocol conflict. An old server generation may not write a second record even with a new key.Step 4
Exact value or time limitThe pickup radius includes 2,000 mm: allow server-side distances of 1,999 and 2,000 mm; reject 2,001 mm. All distances in this example are integer millimetres.Steps 2 and 5
Lost response and restartThe server persists the winning record and crashes before responding. The new authority generation reads the record and confirms the same winner. Unconfirmed movement may revert to the last checkpoint; confirmed crystal ownership survives.Steps 7 and 9

Concurrency in both orders

Expected result
P-21 and P-22 send valid pickup commands for G-21 in the same tick. Test both server-side input orders: the first valid command in that order wins; the other receives already allocated. Exactly 1 crystal is awarded in total.
Return to an earlier step
Steps 3 and 5

Identical and changed retries

Expected result
The same input sequence for G-21 is sent twice and returns the same winning record. The same sequence with a different item identifier is rejected as a protocol conflict. An old server generation may not write a second record even with a new key.
Return to an earlier step
Step 4

Exact value or time limit

Expected result
The pickup radius includes 2,000 mm: allow server-side distances of 1,999 and 2,000 mm; reject 2,001 mm. All distances in this example are integer millimetres.
Return to an earlier step
Steps 2 and 5

Lost response and restart

Expected result
The server persists the winning record and crashes before responding. The new authority generation reads the record and confirms the same winner. Unconfirmed movement may revert to the last checkpoint; confirmed crystal ownership survives.
Return to an earlier step
Steps 7 and 9

First end-to-end validation

End-to-end path
Build an end-to-end test with two clients, competing item pickups and a server handover. One winner remains recorded after response loss and a new authority generation.
Open decision
After the item-award tests pass, add further interactions one at a time. A shared global game world, player trading, paid items and comprehensive fraud detection require a separate follow-up design.

Validate the crystal pickup flow first

Validate the crystal pickup flow first

Build an end-to-end test with two clients, competing item pickups and a server handover.

The design must preserve a shared world through failures.

One winner remains recorded after response loss and a new authority generation.

Alternative considered
A movement-only test does not verify ownership.
Trade-off
The first prototype requires controlled server outages.
Reassess
After the item-award tests pass, add further interactions one at a time.

Terms in this step

Validate the crystal pickup flow first
One winner remains recorded after response loss and a new authority generation.

Try it yourself

For crystal contention and server replacement, specify a test, expected result and step to revisit.

A hint for your attempt

Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.

Compare with a possible solution
First part of the solution
Test P-21 and P-22 in both input orders: exactly the first valid command wins. On failure, revisit input ordering and the data rule in steps 4/5.
Second part of the solution
Crash after storing the record and start a new generation: reject the old writer and preserve the winner. On failure, revisit the architecture and sequence in steps 6/7.

Apply to your project

Which corresponding assumption would you test first in your project? Consider this trigger: After the item-award tests pass, add further interactions one at a time.

Transfer the system boundary, evidence and open decisions to the editable Markdown design template.

Start your own design

Choose a small case from your project. The template collects the ten design tasks and leaves space for your sketches, decisions, and open assumptions. You can edit it in your text editor or note-taking app.

Download design template (.md)
Compare the ten tasks with the example case
  1. Purpose and boundary

    Which corresponding assumption would you test first in your project? Consider this trigger: The game requires offline progress with later reconciliation.

    In the example: Let the game server decide ownership. Only the server's position state and input order establish a shared winner.

  2. Requirements

    Which corresponding assumption would you test first in your project? Consider this trigger: The game design requires fully reproducible movement.

    In the example: Show predictions and confirm rewards only after a durable record exists. Resetting a movement snapshot does not lose a confirmed crystal.

  3. Scale estimates

    Which corresponding assumption would you test first in your project? Consider this trigger: Tick processing regularly exceeds 50 ms in the load test.

    In the example: Measure per-session capacity and concurrent session count separately. An overloaded world does not automatically benefit from additional idle servers.

  4. Interfaces

    Which corresponding assumption would you test first in your project? Consider this trigger: Very long sessions require a defined sequence rollover procedure.

    In the example: Validate input sequence numbers within the player and session identity. A duplicate pickup returns the same record; a changed payload is explicitly rejected.

  5. Data and states

    Which corresponding assumption would you test first in your project? Consider this trigger: The game rules require multiple writers for one world.

    In the example: Bind every durable record to the current authority generation. The datastore rejects old generations even while their clients remain connected.

  6. Overall architecture

    Which corresponding assumption would you test first in your project? Consider this trigger: A few very small sessions justify a simpler deployment.

    In the example: Scale the game process and durable reward store separately. The snapshot data path avoids unnecessary ledger access.

  7. Critical flow

    Which corresponding assumption would you test first in your project? Consider this trigger: World interactions become more complex than one-time item awards.

    In the example: After a restart, load the durable record before awarding again. Both clients eventually see the same winner.

  8. Bottlenecks and trade-offs

    Which corresponding assumption would you test first in your project? Consider this trigger: Rapid changes in the area of interest cause visible gaps.

    In the example: Measure visibility range and snapshot rate, then transmit only relevant characters. 640 KiB/s is a separate assumption before overhead and must be verified on the transport.

  9. Operations and security

    Which corresponding assumption would you test first in your project? Consider this trigger: A proven pattern of abuse allows graduated automated measures.

    In the example: Count server-side rule violations and provide evidence to moderation. Radius checks provide immediate protection; moderation evaluates suspicious behaviour.

  10. Final design

    Which corresponding assumption would you test first in your project? Consider this trigger: After the item-award tests pass, add further interactions one at a time.

    In the example: Build an end-to-end test with two clients, competing item pickups and a server handover. One winner remains recorded after response loss and a new authority generation.