System Design Atlas
Application system

Building digital twin with controlled equipment actions

Connect a building model, measurements and simulated changes with controlled commands to test equipment.

Follow the design
Cutaway office building beside a translucent green digital model and control valve.

Participants and responsibilities

Roles and responsibilities

Building operations reviews proposals and authorises control commands. Model maintenance maps sensors to the building model. Platform operations monitors communication and reconciliation. The local controller checks limits and confirms applied setpoints.

  • Building operations

    Reviews proposals and authorises control commands.

  • Model maintenance team

    Maps sensors to the building model.

  • Platform operations

    Monitors communication and reconciliation.

  • Local controller

    Checks limits and confirms applied setpoints.

Workflow in detail

From the initial need to an evidenced outcome

Each step shows the action of the person, the task of the system and the achieved result.

  1. Model maintenance connects the sensor and equipment.

    Action
    Model maintenance connects the sensor and equipment.
    What the system does
    Checks unambiguous mapping.

    Result: Measurements have domain context.

  2. Building operations reviews a proposal.

    Action
    Building operations reviews a proposal.
    What the system does
    Shows data age and simulated effect.

    Result: The authorisation basis is visible.

  3. Building operations authorises the command.

    Action
    Building operations authorises the command.
    What the system does
    Checks limits and transmits the command.

    Result: The controller decides locally whether to apply it.

  4. The controller reports the result.

    Action
    The controller reports the result.
    What the system does
    Reconciles the confirmed setpoint.

    Result: The effect is evidenced or remains under investigation.

Workflow variations

Clear reactions to deviations

The responsible role retains ownership of each discrepancy until the specified evidence is available.

Stale measurement

Basis exceeds the time window.

Reaction
Authorisation requires a fresh measurement.
Result
No control command is created.

Limit exceeded

The setpoint is outside the permitted range.

Reaction
Validation rejects the command with a reason.
Result
The equipment remains unchanged.

Response lost

The effect could have occurred.

Reaction
Operations reconciles the same command.
Result
Uncertainty remains visible.
Open design steps