Investigating bottlenecks
Which measurement distinguishes customer and item hotspots?
The failure sequence shows where load and retries interact. The diagnostic plan treats measured waiting time, processing duration and business conflicts separately.
Starting point Convert the reservation into a receivable exactly once.
Assumptions for the example case
A fictional example design with one customer, one currency and one warehouse; a binding price offer; complete local stock and credit reservations; and one complete delivery. Figures and quality goals are illustrative test assumptions. Multiple currencies, tax calculation, partial delivery and credit insurance are outside the scope.
Diagnose the limiting resource
Distinguish backlog from business contention
Queue age explains load; capacity_conflict indicates correct rejection when stock or credit is insufficient.
From signal to action
| Signal | Validation | Reaction |
|---|---|---|
| Distinguish item and customer bottlenecks | An item or large customer causes waits. | Measure lock duration separately by item and customer. |
| Conflicts on the shared entity | Two orders each request 10 boxes and 20,000 cents against 15 boxes and 30,000 cents available. In either commit order, one wins; 5 boxes and 10,000 cents remain. No order may reserve only stock or only credit. | Count expected conflicts separately from technical errors. |
| Peak test profile exceeded | 30 orders/s for 600 s = 18,000 orders | A single customer dominates permanently. |
Distinguish item and customer bottlenecks
- Validation
- An item or large customer causes waits.
- Reaction
- Measure lock duration separately by item and customer.
Conflicts on the shared entity
- Validation
- Two orders each request 10 boxes and 20,000 cents against 15 boxes and 30,000 cents available. In either commit order, one wins; 5 boxes and 10,000 cents remain. No order may reserve only stock or only credit.
- Reaction
- Count expected conflicts separately from technical errors.
Peak test profile exceeded
- Validation
- 30 orders/s for 600 s = 18,000 orders
- Reaction
- A single customer dominates permanently.
Distinguish item and customer bottlenecks
Measure lock duration separately by item and customer.
An item or large customer causes waits.
Targeted optimisation preserves the joint commitment.
- Alternative considered
- Global throughput measurement does not show the hotspot.
- Trade-off
- Metrics need limited aggregation.
- Reassess
- A single customer dominates permanently.
Terms in this step
- Distinguish item and customer bottlenecks
- Targeted optimisation preserves the joint commitment.
Try it yourself
Only orders from one large customer are waiting. Name a metric and a case-specific investigation.
A hint for your attempt
Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.
Compare with a possible solution
- First part of the solution
- Separate lock waiting time by customer from lock waiting time by item.
- Second part of the solution
- Inspect access to that customer’s credit reservations. More general API capacity does not eliminate the same serialised credit-limit check.
Apply to your project
Which corresponding assumption would you test first in your project? Consider this trigger: A single customer dominates permanently.