System Design Atlas

Clinical studies with consent and visits

03 / 10Worked example

Scale estimates

Which loads describe mean, test peak and the hotspot when participating in a study?

The commitment for study participation T-25 will be examined under an explicitly assumed scale. 2400 events are spread over 8 operating hours. A test peak of 10 events per second and the hotspot “20 competing data submissions and a withdrawal of the same participation” test different properties than the mean.

Starting point Withdrawal blocks new data collection at commit time.

Assumptions for the example case

Own fictitious example design. Fictitious documentation of an observational study with a pseudonymized participant, a visit and a versioned protocol. The example visit window covers seconds from the planned start: 0 inclusive to 86400 exclusive. All figures and test goals are illustrative assumptions.

Baseline load, peak load and domain hotspot

Three separate scale views

2,400 / 8 hStorage and deferred-processing volumePlan capacity
10/s for 900 sShort test peakTest throughput
20 collections + revocationDomain contention pointTest either order of competing requests

Daily volume, test peak and domain hotspot determine different tests.

Daily-load bar 2400 events / 8 h, peak-load column 10/s, magnifying glass section: 20 competing data collections and a withdrawal of the same participation. These are separate views rather than one linear processing chain.

Reproducible test profile calculations

  1. 01

    Average event rate

    0.0833333 Events/s

    2400 ÷ (8 × 3600 seconds)

    For the designBase load for checklist processing; long business waiting times are not included.

  2. 02

    Assumed test peak

    10 events/s

    10 × 900 seconds = 9000 events in the 15-minute test

    For the designThis deliberately higher test load checks response time and backlog. It is an assumption, rather than a peak measured in production.

  3. 03

    Raw data per day

    9.38 MiB/day

    2400 × 4096 Byte ÷ 1048576

    For the designMetadata budget for participations, protocol references, observation revisions and access log; document content, indices, replicas and backups are added.

  4. 04

    Domain hotspot

    20 competing data collections and a withdrawal of the same participation

    Separate concurrency or ordering test for the same business identity.

    For the designThe visit and withdrawal both expect version 4. If withdrawal wins, the visit is rejected. If the visit wins, it remains an already accepted collection; after a fresh read, withdrawal is accepted against version 5 and blocks further collection.

Separate study load from concurrent actions on a participant

Separate study load from concurrent actions on a participant

Separate study load from concurrent actions on a participant.

20 competing data collections and a withdrawal of the same participation

On average, 0.0833333 events say little about 20 competing data collections and a withdrawal of the same participation. The exercise specifies the input and expected result.

Alternative considered
A test with only 0.0833333 events/s does not capture the concentrated contention.
Trade-off
The separate hotspot profile requires a controlled sequence in addition to the 9000 event test.
Reassess
Measured real peaks above 10 events/s change the load profile.

Try it yourself

Calculate mean rate and number of events in the 15-minute peak test. In addition, explain what the hotspot test proves.

A hint for your attempt

Convert operating hours into seconds first; the peak test lasts 900 seconds.

Compare with a possible solution
Calculation
2400 ÷ (8 × 3600) = 0.0833333 events/s. 10 × 900 = 9000 events.
Domain hotspot
The visit and withdrawal both expect version 4. If withdrawal wins, the visit is rejected. If the visit wins, it remains an already accepted collection; after a fresh read, withdrawal is accepted against version 5 and blocks further collection. The average rate alone cannot prove this commitment.

Apply to your project

Which individual entity in your project concentrates load more strongly than the daily average in this study-visit example?

Next, capture and correction have separate contracts.