System Design Atlas
Application system

Warehouse fulfilment and dynamic route planning

Two picking orders compete for the last item in the same storage location. A shorter picking route must preserve the quantity already allocated.

Follow the design
Storage shelves with cartons, order picking cars and marked walkway.

Business workflow

Two picking orders compete for the last item in the same storage location. A shorter picking route must preserve the quantity already allocated. One warehouse with whole-item quantities, manual picking and a heuristic route recommendation.

These questions are answered by the case

  • One warehouse with whole-item quantities, manual picking and a heuristic route recommendation.
  • Open allocations do not exceed confirmed stock at the storage location; route recommendations do not change quantity commitments.

These questions remain open

  • Robot control, dangerous goods rules, purchasing and automatic inventory correction from path planning.
  1. Commitments on quantities

    Articles and needs are known.

  2. Collecting goods

    Pickers have a suggested route.

  3. Proof of delivery

    Shipping has acknowledged the delivery.

Workflow with tasks and outcomes

Domain subsystems and their interactions

Two picking orders compete for the last item in the same storage location. A shorter route plan shall not alter the quantity already allocated. The domain system map shall include quantity allocation, route recommendation, proof of collection, stock clarification.

User interfaceAccess and responsibilities

Order planning will distribute confirmed quantities to picking orders. Picking confirms actual picks and shortages. Inventory clarification checks deviations at the storage site. Platform operations monitors order delivery and storage. The dispatch system shall acknowledge delivered consignments.

Requests and receive feedback
Warehouse APIDomain subsystems
  • Allocation of quantities

    Allocates item quantities against authoritative stock at the storage location.

    Described in the design
  • Route recommendation

    Recommends a sequence without changing quantities.

    Described in the design
  • Proof of collection

    Records the actual pick against the storage location and order.

    Described in the design
  • Stock clarification

    Connects missing amounts and corrections with physical evidence.

    Described in the design
The tasks of quantity allocation, route recommendation, proof of pick, stock clarification combine the main technical path. Open allocations do not exceed the confirmed available stock at the location; route recommendations do not change the quantity commitment.

Domain responsibilities

Two picking orders compete for the last item in the same storage location. A shorter picking route must preserve the quantity already allocated.

Allocation of quantities

Allocates item quantities against authoritative stock at the storage location.

Route recommendation

Recommends a sequence without changing quantities.

Proof of collection

Records the actual pick against the storage location and order.

Stock clarification

Connects missing amounts and corrections with physical evidence.

Practical examples

  • GS1 · EPCIS and CBV ↗

    Primary source for domain terminology and scope boundaries; it does not document the provider’s internal architecture.

Own fictitious example design. A warehouse with integer quantities, manual picking and a heuristic route recommendation. A route plan is marked as requiring rechecking at age 60 seconds and older; confirmed picks remain valid evidence. All figures and test goals are illustrative assumptions.