Predictive machine maintenance
A model flags a maintenance need. Receiving the same measurement series twice must not create a second maintenance order.
Follow the design
Business workflow
A model flags a maintenance need. Receiving the same measurement series twice must not create a second maintenance order. Fictional suggestions for a single machine based on vibration trends, with human approval of work orders.
These questions are answered by the case
- Fictional suggestions for a single machine based on vibration trends, with human approval of work orders.
- A machine finding per measurement window and model revision generates at most one approved maintenance order; a model output alone does not trigger a physical equipment effect.
These questions remain open
- Automatic shutdown, safety function, specific machine limits and binding remaining service life.
Observing condition
Completeness and measurement time are visible.
Evaluating results
Maintenance records a reasoned decision.
Complete maintenance
The maintenance actually performed is evidenced.
Domain subsystems and their interactions
A model flags a maintenance need. Receiving the same measurement series twice must not create a second maintenance order. The system map connects windowing, model evaluation, finding review and maintenance completion.
Maintenance reviews suggestions and confirms maintenance findings. Production planning plans a released maintenance window. Model managers evaluate model quality and released versions. Platform operations checks data gaps and computing jobs. Sensor source provides time-associated measurements.
Windowing
Assigns measurements to fixed time windows and quality characteristics.
Described in the designModel evaluation
Calculates proposals with documented model version.
Described in the designFinding assessment
Records human review and its rationale.
Described in the designMaintenance completion
Links the work order to the actual maintenance report.
Described in the design
Domain responsibilities
A model flags a maintenance need. Receiving the same measurement series twice must not create a second maintenance order.
Assigns measurements to fixed time windows and quality characteristics.
Calculates proposals with documented model version.
Records human review and its rationale.
Links the work order to the actual maintenance report.
Practical examples
- NIST · Prognostics, Health Management, and Control ↗
Primary source for domain terminology and scope boundaries; it does not document the provider’s internal architecture.
Own fictitious example design. Fictional suggestions for a single machine based on vibration trends, with human approval of work orders. Measurement windows last 60 seconds and are closed on the left, open on the right; a measurement at exactly 60 seconds belongs in the next window. All figures and test goals are illustrative assumptions.