System Design Atlas
Application system

Predictive machine maintenance

A model flags a maintenance need. Receiving the same measurement series twice must not create a second maintenance order.

Follow the design
Machine housing with an attached sensor and a wrench.

Business workflow

A model flags a maintenance need. Receiving the same measurement series twice must not create a second maintenance order. Fictional suggestions for a single machine based on vibration trends, with human approval of work orders.

These questions are answered by the case

  • Fictional suggestions for a single machine based on vibration trends, with human approval of work orders.
  • A machine finding per measurement window and model revision generates at most one approved maintenance order; a model output alone does not trigger a physical equipment effect.

These questions remain open

  • Automatic shutdown, safety function, specific machine limits and binding remaining service life.
  1. Observing condition

    Completeness and measurement time are visible.

  2. Evaluating results

    Maintenance records a reasoned decision.

  3. Complete maintenance

    The maintenance actually performed is evidenced.

Workflow with tasks and outcomes

Domain subsystems and their interactions

A model flags a maintenance need. Receiving the same measurement series twice must not create a second maintenance order. The system map connects windowing, model evaluation, finding review and maintenance completion.

User interfaceAccess and responsibilities

Maintenance reviews suggestions and confirms maintenance findings. Production planning plans a released maintenance window. Model managers evaluate model quality and released versions. Platform operations checks data gaps and computing jobs. Sensor source provides time-associated measurements.

Requests and receive feedback
Maintenance APIDomain subsystems
  • Windowing

    Assigns measurements to fixed time windows and quality characteristics.

    Described in the design
  • Model evaluation

    Calculates proposals with documented model version.

    Described in the design
  • Finding assessment

    Records human review and its rationale.

    Described in the design
  • Maintenance completion

    Links the work order to the actual maintenance report.

    Described in the design
The tasks of windowing, model evaluation, examination of findings, completion of maintenance connect the main technical path. A machine finding per measurement window and model revision generates at most one approved maintenance order; a model output alone does not trigger a physical equipment effect.

Domain responsibilities

A model flags a maintenance need. Receiving the same measurement series twice must not create a second maintenance order.

Windowing

Assigns measurements to fixed time windows and quality characteristics.

Model evaluation

Calculates proposals with documented model version.

Finding assessment

Records human review and its rationale.

Maintenance completion

Links the work order to the actual maintenance report.

Practical examples

Own fictitious example design. Fictional suggestions for a single machine based on vibration trends, with human approval of work orders. Measurement windows last 60 seconds and are closed on the left, open on the right; a measurement at exactly 60 seconds belongs in the next window. All figures and test goals are illustrative assumptions.