Design and evidence
Which tests ensure new text versions and the end of image use?
The final design reuses the complete runtime topology from step 6. Test markers connect key decisions to expected results and earlier steps to revisit. The following items form a test plan; measured evidence is still outstanding.
Starting point Block the origin and track cache invalidation.
Assumptions for the example case
Own fictitious example draft: A news article with text and an image; two-person approval; limited-time image right; versioned publication and correction. Figures and quality goals are illustrative test assumptions. Outside are legal advice, automated verification of source truth and comprehensive advertising sales.
Overall architecture with evidence
Runtime architecture · Editorial team, origin and delivery network
- 1 · Save version
- 2 · Bind release
- 3 · Deliver to the origin
- 4 · Blocking the right
Publishing platform
Versions and rights carry the release; images remain immutable; rights expiration blocks the origin and tracks the invalidation.
Test plan with review loops
| Validation | Expected result | Return to an earlier step |
|---|---|---|
| Concurrency in both orders | Approval of V-3 competes with a text change that creates a new version. If approval wins, it applies only to V-3. If the change wins, approval with the outdated expected version fails. No new version inherits F-121. | Steps 3 and 5 |
| Identical and changed retries | Send publication order for N-121 and V-3 twice: same publication. The same key with a new version is rejected. A duplicate rights-expiry message produces one withdrawal and a tracked invalidation job. | Step 4 |
| Exact value or time limit | Image retrieval on 9 October 17:59:59.999 UTC is allowed; from 18:00:00.000 it is to be blocked. Approval by the same person as author is rejected regardless of time. | Steps 2 and 5 |
| Lost response and restart | The delivery network accepts V-3, but the response is missing. Publication remains pending and is reconciled by version and digest. When usage rights expire, the origin is blocked and cache invalidation is tracked; successful invalidation requires separate evidence. | Steps 7 and 9 |
Concurrency in both orders
- Expected result
- Approval of V-3 competes with a text change that creates a new version. If approval wins, it applies only to V-3. If the change wins, approval with the outdated expected version fails. No new version inherits F-121.
- Return to an earlier step
- Steps 3 and 5
Identical and changed retries
- Expected result
- Send publication order for N-121 and V-3 twice: same publication. The same key with a new version is rejected. A duplicate rights-expiry message produces one withdrawal and a tracked invalidation job.
- Return to an earlier step
- Step 4
Exact value or time limit
- Expected result
- Image retrieval on 9 October 17:59:59.999 UTC is allowed; from 18:00:00.000 it is to be blocked. Approval by the same person as author is rejected regardless of time.
- Return to an earlier step
- Steps 2 and 5
Lost response and restart
- Expected result
- The delivery network accepts V-3, but the response is missing. Publication remains pending and is reconciled by version and digest. When usage rights expire, the origin is blocked and cache invalidation is tracked; successful invalidation requires separate evidence.
- Return to an earlier step
- Steps 7 and 9
First end-to-end validation
- End-to-end path
- Publish V-3, change it and test rights expiry. The new version needs approval; the old usage right expires unambiguously.
- Open decision
- Further media and channels will then be added. Legal advice, automated verification of source truth and comprehensive advertising sales require their own follow-up draft.
Test corrections
Publish V-3, change it and test rights expiry.
Publication and rights can diverge.
New version needs release; old right clearly ends.
- Alternative considered
- A normal publication test does not verify ongoing maintenance.
- Trade-off
- Controlled clock and cache states are necessary.
- Reassess
- Further media and channels will then be added.
Terms in this step
- Test corrections
- New version needs release; old right clearly ends.
Try it yourself
State the expected result and earlier step to revisit for a new text version and rights expiry.
A hint for your attempt
Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.
Compare with a possible solution
- First part of the solution
- A new version after F-121 remains unreviewed and is not published automatically; failures return to step 5.
- Second part of the solution
- Rights expiry blocks the origin and tracks invalidation until evidence arrives; failures return to step 7/9.
Apply to your project
Which corresponding assumption in your project would you check first? Consider this trigger: After that, further media and channels will be added.
Start your own design
Choose a small case from your project. The template collects the ten design tasks and leaves space for your sketches, decisions, and open assumptions. You can edit it in your text editor or note-taking app.
Download design template (.md)Compare the ten tasks with the example case
Purpose and boundary
Which corresponding assumption in your project would you check first? Consider this trigger: Extensive research needs its own document structure.
In the example: Preserve source references on the text revision. Editors can trace the rationale behind the publication.
Requirements
Which corresponding assumption in your project would you check first? Consider this trigger: Emergency process is explicitly regulated.
In the example: Require distinct identities for the two-person review. F-121 requires a different authorised person.
Scale estimates
Which corresponding assumption in your project would you check first? Consider this trigger: Real peaks exceed the assumption.
In the example: Test 833.33 requests/s as a separate media profile. Editorial activity rates do not size content delivery.
Interfaces
Which corresponding assumption in your project would you check first? Consider this trigger: Multichannel publication requires separate target references.
In the example: Bind the publication command to a version and digest. V-3 remains the requested version.
Data and states
Which corresponding assumption in your project would you check first? Consider this trigger: Domain-defined change types need their own workflow.
In the example: Limit approval to the reviewed revision. A new version inherits no review evidence.
Overall architecture
Which corresponding assumption in your project would you check first? Consider this trigger: Service contract delivers stronger publication commitment.
In the example: Track editorial decisions and delivery evidence separately. Pending publication remains visible to the newsroom.
Critical flow
Which corresponding assumption in your project would you check first? Consider this trigger: delivery service changes its status interface.
In the example: Check the version and digest at the destination. A retry does not produce a different version.
Bottlenecks and trade-offs
Which corresponding assumption in your project would you check first? Consider this trigger: correction latency exceeds the agreement.
In the example: Measure versions separately at the origin and edge. Check invalidation specifically.
Operations and security
Which corresponding assumption in your project would you check first? Consider this trigger: Immediate revocation requires stricter retrieval protection.
In the example: Block the origin and track cache invalidation. A blocking record alone does not prove that the edge has been cleared.
Final design
Which corresponding assumption in your project would you check first? Consider this trigger: After that, further media and channels will be added.
In the example: Publish V-3, change it and test rights expiry. The new version needs approval; the old usage right expires unambiguously.