Material is not enough
Parallel orders require more material than is available.
- Reaction
- The second allocation is rejected in full.
- Result
- The operation leaves no incomplete provenance record.
A manufacturer links consumed material batches, produced assemblies and inspection results. Quality assurance releases a documented production state and identifies affected downstream batches when defects are found later.
Follow the design
Participants and responsibilities
A manufacturer links consumed material batches, produced assemblies and inspection results. Quality assurance releases a documented production state and identifies affected downstream batches when defects are found later.
Captures actually consumed materials and produced pieces.
Evaluates inspections and owns release and blocking decisions.
Plans orders and takes into account blocked batches.
Restores event ingestion and provenance queries.
Supplies identified measurements with units and test-equipment status.
Workflow in detail
Each step shows the action of the person, the task of the system and the achieved result.
Result: Provenance and the available quantity are consistent.
Result: An associated proof of quality is created.
Result: Shipping can refer to the current status.
Result: Quality assurance can conduct the recall review.
Workflow variations
Each deviation is given a responsible role and a visible next step.
Parallel orders require more material than is available.
The measured value and the expected test plan are contradictory.
A corrected result relates to assemblies already shipped.