Final design
Which complete flow needs robust evidence before extending the design?
The complete flow leads from S-42 through H-17 and B-17 to T-17 or a confirmed refund. The initial design is product-neutral, with transactional allocation, a durable webhook inbox and an outbox for external compensation. The next implementation step is a vertical end-to-end path with explicit failure scenarios.
Starting point Start with the decisions about allocation, durable event ingestion and compensation.
Assumptions for the example case
Example design for one event with 1,000 numbered seats. Each order contains exactly one seat. Hold, sale, payment and ticket are separate entities. All figures and targets are illustrative assumptions, not provider metrics. Admission scanning, resale, dynamic pricing and multi-seat orders are outside scope. Sources checked on 8 September 2026. The order model covers successful payments, including delayed success; final unpaid cancellations need their own terminal state before implementation.
Overall architecture of ticket sales
Overall architecture · seat allocation, payment, ticket and compensation
or confirmed repayment
Ticket platform · owned runtime
- Browser → APIHTTPS: Hold, Checkout, own status; API → Browser: Result
- Payment service → APISigned webhooks; API → payment service: 2xx after inbox commit
- API → storeHold/checkout transaction or separate inbox ingestion; store → API: commit/result
- Worker → storePoll inbox/outbox, validate allocation and write atomically; store → worker: data/commit
- Worker → payment serviceIdempotent payment/refund commands and status reconciliation; service → worker: result or unknown outcome
- Browser and payment service
- API and Worker
- Transactional storage
The final overview connects the path from S-42 to a ticket or confirmed refund with runtime components and outstanding evidence.
Combined architectural decisions
Active binding per V-17/S-42 in a relational transaction
Only a maximum of one valid hold may bind S-42.
- Trade-off
- Conflicts and lock waiting time become visible.
- Reassess
- For load test results on hotspot or latency.
Signed Webhook Inbox before 2xx and Worker after Commit
Retries, out-of-order delivery and crashes must not lose an event.
- Trade-off
- Order status can be temporary payment_pending.
- Reassess
- With increasing inbox age or delivery errors.
compensation_pending and an idempotent refund outbox
Z-17 after expiry grants no seat entitlement, but still requires an evidenced resolution.
- Trade-off
- Customer service handles unresolved compensation.
- Reassess
- In case of volume or age-related backlog.
Test plan and review loops
| Validation | Expected result | Return to an earlier step |
|---|---|---|
| 100 competing holds on S-42 | Not more than one held | Step 2 and 5: Check Invariant, Index and Transaction |
| Payment after expiry of H-17 | No T-17; B-17 compensation_pending | Step 5 and 7: Check state and sequence model |
| Duplicate and Crash after Commit | No second confirmation or refund | Step 4, 6 and 7: Check the Inbox/Outbox boundary |
| Start window and 100 hold/s | Latency, Conflict and Error Values Visible | Steps 3 and 8: Check load profile and measures |
| Restoration sample | open inbox/outbox and matched orders | Step 9: specify operational plan and responsibilities |
100 competing holds on S-42
- Expected result
- Not more than one held
- Return to an earlier step
- Step 2 and 5: Check Invariant, Index and Transaction
Payment after expiry of H-17
- Expected result
- No T-17; B-17 compensation_pending
- Return to an earlier step
- Step 5 and 7: Check state and sequence model
Duplicate and Crash after Commit
- Expected result
- No second confirmation or refund
- Return to an earlier step
- Step 4, 6 and 7: Check the Inbox/Outbox boundary
Start window and 100 hold/s
- Expected result
- Latency, Conflict and Error Values Visible
- Return to an earlier step
- Steps 3 and 8: Check load profile and measures
Restoration sample
- Expected result
- open inbox/outbox and matched orders
- Return to an earlier step
- Step 9: specify operational plan and responsibilities
Determine before implementation
- Business rules
- Price, payment methods, hold renewal, cancellation, multi-seat ordering, identity and access rights are specified with the event operation. In particular, the limited success/compensation model still lacks the final order conclusion after a proven payment failure or unpaid cancellation.
- Operations
- SLOs, alert limits, retention, duty hours, RTO/RPO and escalation of customer service receive measurable agreements.
- Technology
- Concrete database, queue and cache products only follow from the environment, capabilities, compliance and the measured results of the end-to-end path.
Terms in this step
- Vertical end-to-end path
- A vertical end-to-end path implements a complete sequence, including data, interfaces, errors and evidence, rather than isolated layers of technology.
Try it yourself
Create four blocks for your case: scarce resource, external success, failure scenario and evidence. Add a decision, test and review loop to each block.
A hint for your attempt
A complete solution does not just name building blocks. It connects the transition, the expected effect and the test that would make a false assumption visible.
Compare with a possible solution
- Scarce resource
- A transactional hold protects V-17/S-42. Test: 100 parallel attempts produce at most one held result; failures return to the allocation rule or data access design.
- External success
- Signed event EV-17 for payment Z-17 is deduplicated and persisted in the inbox. Test: duplicates and a crash after commit create no second effect; failures return to the webhook and outbox boundaries.
- Late payment
- Despite successful Z-17, expired H-17 leads to compensation_pending and an idempotent refund. Test: no T-17; confirmed refunded; failures return to the state model.
- Proof of operation
- The launch window, open inbox and outbox, and recovery are observable. Load and restore tests provide clear measurements; findings return to the load or operations plan.
Apply to your project
What small but complete process would test the most critical assumption of your own system first?
Start your own design
Choose a small case from your project. The template collects the ten design tasks and leaves space for your sketches, decisions, and open assumptions. You can edit it in your text editor or note-taking app.
Download design template (.md)Compare the ten tasks with the example case
Purpose and boundary
Which scarce domain resource does your system reserve only temporarily?
In the example: Ticket sales protect S-42 as scarce inventory and treat payment success as a response requiring validation.
Requirements
What business invariant does your system need in addition to its latency or availability goals?
In the example: The application can commit only one active allocation per V-17/S-42 and must compensate late payment successes without a second seat commitment.
Scale estimates
Which domain resource creates a single hotspot in your load profile?
In the example: The design protects allocation transactionally and optimises reads only using measured load.
Interfaces
Which external event must your system persist before acknowledging it?
In the example: The webhook acknowledges a durable message. The worker creates the domain status only after checking the hold, order and seat allocation.
Data and states
Which domain entities need their own states rather than one combined status?
In the example: Successful payment alone is insufficient for T-17. The commit checks H-17; expiry opens a documented compensation path.
Overall architecture
Which domain changes must share a transaction, and which may cooperate asynchronously?
In the example: A modular monolith with a relational transaction, inbox, outbox and worker protects the critical allocation while keeping the initial design within a small deployment structure.
Critical flow
What external effect can occur in your system after the local authorization expires?
In the example: Payment can succeed without granting a seat entitlement. The current hold decides in the local commit; subsequent compensation remains traceable.
Bottlenecks and trade-offs
Which metric reveals a technical problem, and which shows a domain backlog?
In the example: Additional infrastructure follows a measured bottleneck. The exclusivity rule for S-42 stays unchanged.
Operations and security
Which open external states need a named role and proof of completion in your company?
In the example: Reconcile unknown payment states. In the illustrated payment-success branch, confirmed or refunded evidences completion. Unpaid cancellations need a separate order closure.
Final design
What small but complete process would test the most critical assumption of your own system first?
In the example: S-42 is held once, Z-17 is durably accepted, and only a still-valid H-17 permits confirmation as T-17. A late payment is compensated and remains traceable.