Investigating bottlenecks
Which measurement explains long waiting times for missing evidence?
The failure sequence shows where load and retries interact. The diagnostic plan treats measured waiting time, processing duration and business conflicts separately.
Starting point Serialise the transition to stored Z-31 against withdrawal.
Assumptions for the example case
Fictitious example design: a simple property claim under one policy; manual coverage decision based on a fixed document version; one full payout in EUR; reasoned rejection and a later reassessment as a separate process. Figures and quality targets are illustrative test assumptions. Automatic claim rejection by AI, fraud investigation, partial payments and comprehensive statutory deadline calculation are outside scope.
Diagnose the limiting resource
Diagnosing upload backlog and conflict separately
6,000 notifications test throughput; initiation versus withdrawal tests atomic claim state.
From signal to action
| Signal | Validation | Reaction |
|---|---|---|
| Measure outstanding evidence requests visibly | Many cases wait for evidence rather than computing time. | Separate waiting time for each missing document from technical processing time. |
| Conflicts on the shared entity | Payout initiation races with withdrawal of approval before a payout command is persisted. Withdrawal first: no Z-31. Payout initiation first: withdrawal conflicts; Z-31 remains open until its outcome is evidenced. | Count expected conflicts separately from technical errors. |
| Peak test profile exceeded | 20 notifications/s for 300 s = 6,000 notifications | Document verification itself becomes the measured bottleneck. |
Measure outstanding evidence requests visibly
- Validation
- Many cases wait for evidence rather than computing time.
- Reaction
- Separate waiting time for each missing document from technical processing time.
Conflicts on the shared entity
- Validation
- Payout initiation races with withdrawal of approval before a payout command is persisted. Withdrawal first: no Z-31. Payout initiation first: withdrawal conflicts; Z-31 remains open until its outcome is evidenced.
- Reaction
- Count expected conflicts separately from technical errors.
Peak test profile exceeded
- Validation
- 20 notifications/s for 300 s = 6,000 notifications
- Reaction
- Document verification itself becomes the measured bottleneck.
Measure outstanding evidence requests visibly
Separate waiting time for each missing document from technical processing time.
Many cases wait for evidence rather than computing time.
Claims handlers identify the actual cause of long lead times.
- Alternative considered
- More workers do not get missing evidence.
- Trade-off
- Record domain causes in a structured form.
- Reassess
- Document verification itself becomes the measured bottleneck.
Terms in this step
- Measure outstanding evidence requests visibly
- Claims handlers identify the actual cause of long lead times.
Try it yourself
Lead time rises while technical latency stays low. Choose a domain measurement and an appropriate response.
A hint for your attempt
Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.
Compare with a possible solution
- First part of the solution
- Age and reason for open requests show whether evidence is missing. This waiting time is recorded separately from the file check duration.
- Second part of the solution
- Claims handlers follow up the specific evidence request. Additional processing workers cannot supply the missing document.
Apply to your project
Which corresponding assumption would you check first in your project when document verification itself becomes the measured bottleneck?