Scale estimates
What loads do the average, test peak and hotspot describe for this train service?
Test the guarantee for train service F-24 at an explicitly assumed scale. There are 86400 events over 24 operating hours. A test peak of 20 events per second and a hotspot of 100 reports for the same service arriving in reverse source order test different properties from the average load.
Starting point Every forecast includes freshness information.
Assumptions for the example case
Original fictional design: a regional rail line with dated services, stops and manually confirmed cancellations. An actual-status report is current at age < 90 seconds; at 90 seconds its timestamp is marked stale. All figures and test targets are illustrative assumptions.
Baseline load, peak load and domain hotspot
Three separate scale views
Daily volume, test peak and domain hotspot determine different tests.
Reproducible test profile calculations
- 01
Average event rate
1 event/s86400 ÷ (24 × 3600 seconds)
For the designBase load for feed processing; long business waiting times are not included.
- 02
Assumed test peak
20 events/s20 × 900 seconds = 18000 events in the 15-minute test
For the designThis deliberately higher test load checks response time and backlog. It is an assumption, rather than a peak measured in production.
- 03
Raw data per day
42.19 MiB/day86400 × 512 bytes ÷ 1048576
For the designMetadata budget for train service status, source reports and cancellation history. Document contents, indexes, replicas and backups require additional storage.
- 04
Domain hotspot
100 reports for the same train service in reverse source orderSeparate concurrency or ordering test for the same business identity.
For the designTwo reports with source versions 8 and 9 arrive in both orders: version 9 remains visible; version 8 is retained in history and does not overwrite the display.
Test a hotspot on a single train service separately
Test a hotspot on a single train service separately.
100 reports for the same train service in reverse source order
An average of 1 event/s says little about 100 reports for the same train service arriving in reverse source order. The exercise specifies the input and expected result.
- Alternative considered
- A test with only 1 event/s does not capture the concentrated contention.
- Trade-off
- The separate hotspot profile requires controlled ordering in addition to the 18000-event test.
- Reassess
- Measured real peaks above 20 events/s change the load profile.
Try it yourself
Calculate mean rate and number of events in the 15-minute peak test. In addition, explain what the hotspot test proves.
A hint for your attempt
Convert operating hours into seconds first; the peak test lasts 900 seconds.
Compare with a possible solution
- Calculation
- 86400 ÷ (24 × 3600) = 1 event/s. 20 × 900 = 18000 events.
- Domain hotspot
- Two reports with source versions 8 and 9 arrive in both orders: version 9 remains visible; version 8 is retained in history and does not overwrite the display. The average rate alone cannot verify this guarantee.
Apply to your project
Which individual entity concentrates more load than the daily average suggests in passenger information?