Requirements
Which business rule protects the work order, and how is the agreed boundary tested?
The system boundary leads to business rules and measurable goals. The central invariant for work order A-35 is that an offline report records a claimed action against the received revision and grants no new safety authorisation or work permission. An invariant must hold after every completed operation. Quality goals describe measurable operational behaviour.
Starting point Offline storage records the assigned revision.
Assumptions for the example case
A fictional example design for offline documentation of previously authorised routine work, with separate safety procedures. Zone information is marked stale from age 300 seconds; this does not authorise entry or work. All figures and test targets are illustrative assumptions.
Business guarantee and measurable limit
Guarantee and validation gates
An offline report records an action against the received revision and grants no authorisation.
Business requirements (functional)
Further reading
- Durable commitment
- An offline report records a claimed action against the received work order revision; it grants no new safety authorisation or work permission.
- Evidence and closure
- Cancellation is delivered and acknowledged before confirmed local execution.
Operational goals (non-functional)
Further reading
- Local processing
- Illustrative target: 95% of local commands complete within 800 milliseconds in a 15-minute profile at 200 commands/s. External processing and human waiting time are measured separately.
- Observable limit
- Zone information is marked stale from age 300 seconds; this does not authorise entry or work. The boundary test checks the rule defined for this example; operational evidence remains outstanding.
Outdated zone information is visibly marked
Outdated zone information is visibly marked.
An offline report records a claimed action against the received work order revision; it grants no new safety authorisation or work permission.
Zone information is marked stale from age 300 seconds; this does not authorise entry or work. The exercise specifies the input and expected result.
- Alternative considered
- A response-time target alone leaves invalid business states unchecked.
- Trade-off
- Strict validation can pause an operation for investigation.
- Reassess
- Measured processing times or new contracts with the local gateway require a fresh review of the targets.
Try it yourself
Separate the business invariant from the 800-millisecond target. Explain the exact limit in this case.
A hint for your attempt
Completing an operation quickly but incorrectly does not satisfy the business guarantee.
Compare with a possible solution
- Business rule
- An offline report records a claimed action against the received work order revision; it grants no new safety authorisation or work permission. The counterexample test checks the permitted state.
- Operations and boundary
- The 800-millisecond target applies to 95% of local commands in the assumed peak profile. Zone information is marked stale from age 300 seconds; this does not authorise entry or work.
Apply to your project
Which rule of your project remains binding even with slow processing?