Data and states
Which changes to the work order must apply together, and what remains protected after completion?
The contracts require an authoritative datastore for work order A-35. Each device maintains a monotonically increasing event number within its own identity namespace. Data-centre receipt time and reported action time remain separate. Stale central device information cannot reliably establish whether a person has already performed the work. State and command result are stored together, so the same change request remains recognisable after restart.
Starting point Each device has its own event namespace.
Assumptions for the example case
A fictional example design for offline documentation of previously authorised routine work, with separate safety procedures. Zone information is marked stale from age 300 seconds; this does not authorise entry or work. All figures and test targets are illustrative assumptions.
Authoritative data and permitted state transitions
Entities and life cycle
An offline report records an action against the received revision and grants no authorisation.
Domain entities and relationships
| Entity | Authoritative attributes | Relationship |
|---|---|---|
| Work assignment | A-35; revision, shift and responsibility | The central system maintains the assigned revision. |
| Device | G-35; identity and monotonically increasing event number | The local journal preserves reports awaiting acknowledgement. |
| Zone information | Z-35; source and freshness timestamp | Documentation context; grants no safety authorisation. |
| Reconciliation document | Device report, central state and decision | A conflict preserves both states until the outcome is evidenced. |
Work assignment
- Authoritative attributes
- A-35; revision, shift and responsibility
- Relationship
- The central system maintains the assigned revision.
Device
- Authoritative attributes
- G-35; identity and monotonically increasing event number
- Relationship
- The local journal preserves reports awaiting acknowledgement.
Zone information
- Authoritative attributes
- Z-35; source and freshness timestamp
- Relationship
- Documentation context; grants no safety authorisation.
Reconciliation document
- Authoritative attributes
- Device report, central state and decision
- Relationship
- A conflict preserves both states until the outcome is evidenced.
Permitted state transitions
| Starting point | Target | Precondition |
|---|---|---|
| zugeteilt | lokal_bearbeitet | The device records the action locally against the assigned revision. |
| lokal_bearbeitet | abgeglichen | The central system checks origin, revision and a complete event sequence. |
| lokal_bearbeitet | klärfall | The central work-order state differs or events are missing. |
| abgeglichen or klärfall | abgeschlossen | The shift supervisor confirms the evidenced actual outcome. |
| zugeteilt | storniert | Cancellation is delivered and acknowledged before confirmed local execution. |
| abgeschlossen or storniert | terminal | New execution is rejected; late reports are retained as investigation evidence. |
zugeteilt
- Target
- lokal_bearbeitet
- Precondition
- The device records the action locally against the assigned revision.
lokal_bearbeitet
- Target
- abgeglichen
- Precondition
- The central system checks origin, revision and a complete event sequence.
lokal_bearbeitet
- Target
- klärfall
- Precondition
- The central work-order state differs or events are missing.
abgeglichen or klärfall
- Target
- abgeschlossen
- Precondition
- The shift supervisor confirms the evidenced actual outcome.
zugeteilt
- Target
- storniert
- Precondition
- Cancellation is delivered and acknowledged before confirmed local execution.
abgeschlossen or storniert
- Target
- terminal
- Precondition
- New execution is rejected; late reports are retained as investigation evidence.
Atomic changes and versions
- Content reference
- Each device maintains a monotonically increasing event number within its own identity namespace. Data-centre receipt time and reported action time remain separate. Stale central device information cannot reliably establish whether a person has already performed the work.
- Shared commit
- The shift work order API checks the device, work order revision, local event number, actual action time and report, then writes the business change, command result and any pending work in one transaction. Commit makes these changes durably visible together. Before commit, rollback ends the attempt without partial effects.
- Concurrency
- The central change and offline completion both use revision 2. If completion wins, it is recorded and the change conflicts. If the change wins, the late completion opens an investigation case; the actual report is preserved rather than discarded as though the action never happened.
- Terminal completion
- After abgeschlossen, replay creates no second completion. A late new report for a cancelled work order creates an investigation task rather than silently reactivating it.
Cover the full scope of the case
- Concrete rule
- Central and local device clocks may differ. Ordering relies on device identity and event number, rather than time alone. Replacing a device requires a new identity or documented continuation; event numbers must not silently restart from zero.
Derive storage needs from access patterns
- Authoritative relational datastore
- The central system maintains the assigned revision. The local journal preserves reports awaiting acknowledgement. The design therefore selects a relational metadata store with uniqueness constraints and short transactions. Historical versions remain referenceable; a rebuildable read model must not overwrite authoritative state.
- Large content and measurement series
- Derived views and extensive measurement or event histories are read separately according to their access patterns. Binding state decisions remain in the authoritative datastore.
A conflict preserves both the original report and the central state
A conflict preserves both the original report and the central state.
The central change and offline completion both use revision 2. If completion wins, it is recorded and the change conflicts. If the change wins, the late completion opens an investigation case; the actual report is preserved rather than discarded as though the action never happened.
After abgeschlossen, replay creates no second completion. A late new report for a cancelled work order creates an investigation task rather than silently reactivating it. The exercise specifies the input and expected result.
- Alternative considered
- Separate unversioned changes allow an older state to overwrite the newer one.
- Trade-off
- Changes to work order A-35 are serialized briefly.
- Reassess
- Measured waiting times while a gateway uploads 1000 buffered events after reconnecting justify reviewing transaction duration.
Try it yourself
Explain the two possible winner orders in the case contract. Also determine the behaviour after terminal completion.
A hint for your attempt
Content revision and aggregate version have different tasks.
Compare with a possible solution
- Concurrency
- The central change and offline completion both use revision 2. If completion wins, it is recorded and the change conflicts. If the change wins, the late completion opens an investigation case; the actual report is preserved rather than discarded as though the action never happened.
- Completion
- After abgeschlossen, replay creates no second completion. A late new report for a cancelled work order creates an investigation task rather than silently reactivating it.
Apply to your project
Which states must remain protected in your model against late replay?