A flexibility platform converts an agreed power request into time-limited equipment commands. Grid operators see the request, confirmed acceptance and measured effect separately; equipment operators retain responsibility for local safety.

Follow the design
Electric substation with battery storage and orange switching lever.

Business workflow

A flexibility platform converts an agreed power request into time-limited equipment commands. Grid operators see the request, confirmed acceptance and measured effect separately; equipment operators retain responsibility for local safety.

These questions are answered by the case

  • Controllable equipment with an agreed power range
  • 15-minute dispatch
  • UTC time window
  • Local safety limits and measured effects

These questions remain open

  • Protection systems
  • Primary frequency control
  • Market bids and evidence of compliance with specific energy regulations
  1. Agree flexibility

    Grid operations requests an agreed reduction.

  2. Apply time-limited control

    Equipment control checks the command against local limits.

  3. Evidence the effect

    Equipment operations investigates deviations and closes the dispatch with evidence.

Workflow with tasks and outcomes

Domain subsystems and their interactions

Agreed flexibility → time-limited control → evidenced effect. The platform converts agreed power requests into time-limited equipment commands. Grid operations sees requests, accepted commands and measured effects separately; equipment operations retains local safety responsibility.

User interfaceAccess for the roles involved

Grid operations requests agreed flexibility for a time window. Equipment operations owns local limits and investigates missing effects. Flexibility dispatchers check availability and track dispatches. Platform operations runs transmission and measurement ingestion. Equipment control validates commands locally and executes them within safety limits.

Requests and receive feedback
Availability and dispatch planningDomain subsystems
  • Availability

    Binds agreed kW and time window.

    Described in the design
  • Dispatch planning

    Reserves available flexibility.

    Described in the design
  • Control contract

    Assigns command generation and expiry time.

    Described in the design
  • Measurement quality

    Checks time, unit and quality.

    Described in the design
  • Effect assessment

    Compares requested and evidenced behaviour.

    Described in the design
Agreed flexibility → time-limited control → evidenced effect. The design assigns these domain responsibilities to runtime processes.

Tasks and responsibilities

A flexibility platform converts an agreed power request into time-limited equipment commands. Grid operators see the request, confirmed acceptance and measured effect separately; equipment operators retain responsibility for local safety.

Availability

Binds agreed kW and time window.

Dispatch planning

Reserves available flexibility.

Control contract

Assigns command generation and expiry time.

Measurement quality

Checks time, unit and quality.

Effect assessment

Compares requested and evidenced behaviour.

Practical examples

A fictional design with controllable equipment and an agreed power range; 15-minute dispatch; UTC time windows; local safety limits and measured effects. Figures and quality targets are illustrative test assumptions. Protection systems, primary frequency control, market bids and evidence of specific energy-regulation compliance remain outside its scope.