Power capacity exhausted
Several dispatches request the same flexibility.
- Reaction
- Dispatchers reject the excess commitment.
- Result
- The agreed equipment limit is preserved.
A flexibility platform converts an agreed power request into time-limited equipment commands. Grid operators see the request, confirmed acceptance and measured effect separately; equipment operators retain responsibility for local safety.
Follow the design
Participants and responsibilities
A flexibility platform converts an agreed power request into time-limited equipment commands. Grid operators see the request, confirmed acceptance and measured effect separately; equipment operators retain responsibility for local safety.
Requests the agreed flexibility for a time window.
Owns local safety limits and investigates missing effects.
Checks availability and tracks dispatches.
Runs transmission and measurement ingestion.
Validates commands locally and executes them within safety limits.
Workflow in detail
Each step shows the action of the person, the task of the system and the achieved result.
Result: A time-limited dispatch is planned.
Result: Acceptance or rejection is documented.
Result: The actual effect becomes apparent.
Result: The dispatch has a documented domain outcome.
Workflow variations
Each deviation is given a responsible role and a visible next step.
Several dispatches request the same flexibility.
The latest observation is too old to support a new dispatch.
The time window ends without a platform connection.