System Design Atlas

Electricity grid flexibility dispatch

01 / 10Worked example

Purpose and system boundary

What local responsibility remains in case of failure of the platform connection?

Equipment A-81 has 50 kW of agreed dispatchable power. Dispatch F-81 requests a 20 kW reduction from 12:00 to 12:15 UTC. Control command C-81 carries generation 8 and the same scope. Measurement M-81 must be at most 30 s old to justify new dispatch planning. The example covers controllable equipment with an agreed power range, 15-minute dispatch, UTC time windows, local safety limits and measured effects.

Starting point The connection to the platform can be disconnected.

Assumptions for the example case

A fictional design with controllable equipment and an agreed power range; 15-minute dispatch; UTC time windows; local safety limits and measured effects. Figures and quality targets are illustrative test assumptions. Protection systems, primary frequency control, market bids and evidence of specific energy-regulation compliance remain outside its scope.

Context and responsibilities

Dispatch, local control and measured effect

Grid operationsRequests flexibility
Flexibility dispatchersPlans and tracks dispatches

Flexibility platform

Agree flexibility50 kW + time window
Apply time-limited controlGeneration + expiry
Evidence the effectfresh measurement
Equipment operationsOwns local limits
Equipment controlExecutes commands safely on site
Netzführung → VereinbarungF-81 · 20 kW
Steuerung → AnlagensteuerungC-81 · Generation 8
Anlagensteuerung → NachweisM-81

Command acceptance and actual kW effect require separate evidence; local safety takes priority.

The platform connection may fail. Enforce equipment limits and safe fallback behaviour locally. Expired remote commands must not retain an effect.

Assumptions for the worked example

Scope
Controllable equipment with an agreed power range; 15-minute dispatch; UTC time windows; local safety limits and measured effects.
Possible extensions
Protection systems, primary frequency control, market bids and evidence of specific energy-regulation compliance.

Preserve local safety

Preserve local safety

Enforce equipment limits and safe fallback behaviour locally.

The connection to the platform can be disconnected.

An expired remote order may not retain a lasting effect.

Alternative considered
A cloud decision for every safety action depends on connectivity.
Trade-off
Local rules require coordinated commissioning.
Reassess
Another asset class changes the protection requirements.

Terms in this step

Preserve local safety
An expired remote order may not retain a lasting effect.

Try it yourself

C-81 is running when the connection fails. Identify where expiry and local limits are enforced.

A hint for your attempt

Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.

Compare with a possible solution
First part of the solution
The plant control system checks the local end of validity and safety limits.
Second part of the solution
From 12:15, the agreed safe fallback rule takes over even without platform connectivity; a cloud timeout does not replace it.

Apply to your project

Which corresponding assumption would you check first in your project when a different equipment class changes safety requirements?

Step 2 examines: separate acceptance from effect.