System Design Atlas

Construction change orders, drawing revisions and cost impact

05 / 10Worked example

Data and states

Which changes to the change order must take effect together, and what stays protected after completion?

The contracts require an authoritative datastore for change order N-32. The example comprises 20 units at 25000 cents, totalling 500000 cents: exactly the internal review threshold. A document hash binds the stored bytes; a URL alone may later point to a different drawing revision. The state is stored with its command result so the same command remains recognisable after a restart.

Starting point Approval specifies three concrete content references.

Assumptions for the example case

Original fictional design: an internal approval workflow for a change order with frozen drawings and costs. The illustrative internal threshold is 500000 cents. Up to and including this amount, one approver is sufficient; above it, this case requires a second approver. All figures and test targets are illustrative assumptions.

Authoritative data and permitted state transitions

Entities and life cycle

Change order N-32Scope of work, status and approval binding
Drawing revision P-32Immutable drawing revision
Cost revision K-32Amount in cents and calculation version
Nachtrag N-32 → Planrevision P-32Binds the reviewed drawing revision
Nachtrag N-32 → Kostenrevision K-32Binds the reviewed cost revision
1entwurf → eingereicht
2eingereicht → freigegeben | abgelehnt
3freigegeben → abgeschlossen
4abgelehnt | abgeschlossen (terminal)

Approval binds the drawing revision, scope of work and cost revision.

The example comprises 20 units at 25000 cents, totalling 500000 cents: exactly the internal review threshold. A document hash binds the stored bytes; a URL alone may later point to a different drawing revision.

Domain entities and relationships

EntityAuthoritative attributesRelationship
Change orderN-32; business identity and statusHas immutable submitted revisions.
Drawing revisionP-32; drawing hash and archive referenceMany change orders may reference the same drawing revision.
Cost revisionK-32; quantity, unit price and totalApproval references the same cost content.
Approval recordPerson, role, content references and timestampAbove the threshold, two distinct authorised approvers are required.

Change order

Authoritative attributes
N-32; business identity and status
Relationship
Has immutable submitted revisions.

Drawing revision

Authoritative attributes
P-32; drawing hash and archive reference
Relationship
Many change orders may reference the same drawing revision.

Cost revision

Authoritative attributes
K-32; quantity, unit price and total
Relationship
Approval references the same cost content.

Approval record

Authoritative attributes
Person, role, content references and timestamp
Relationship
Above the threshold, two distinct authorised approvers are required.

Permitted state transitions

Starting pointTargetPrecondition
entwurfeingereichtDrawing, scope of work and amount in cents are frozen.
eingereichteingereichtA new revision before approval increments the version and invalidates consent to the old content.
eingereichtfreigegebenAll required approvals bind the same content.
eingereichtabgelehntApprovers record the reason for rejection.
freigegebenabgeschlossenConstruction management confirms documented implementation of the approved scope.
abgelehnt or abgeschlossenterminalChanges require a new change order.

entwurf

Target
eingereicht
Precondition
Drawing, scope of work and amount in cents are frozen.

eingereicht

Target
eingereicht
Precondition
A new revision before approval increments the version and invalidates consent to the old content.

eingereicht

Target
freigegeben
Precondition
All required approvals bind the same content.

eingereicht

Target
abgelehnt
Precondition
Approvers record the reason for rejection.

freigegeben

Target
abgeschlossen
Precondition
Construction management confirms documented implementation of the approved scope.

abgelehnt or abgeschlossen

Target
terminal
Precondition
Changes require a new change order.

Atomic changes and versions

Content reference
The example comprises 20 units at 25000 cents, totalling 500000 cents: exactly the internal review threshold. A document hash binds the stored bytes; a URL alone may later point to a different drawing revision.
Shared commit
The change order API validates the change-order version, drawing hash, scope hash, cost revision and amount in cents. It writes the business change, command result and any pending work in one transaction. Commit makes these changes durably visible together. Before commit, rollback ends the attempt without partial effects.
Concurrency
A new drawing revision and approval both expect version 6. If the drawing change wins, the old approval request is invalidated. If approval wins, it binds the old scope; the new drawing creates a new change order requiring review and leaves the approval unchanged.
Terminal completion
Completed change orders receive no cost changes; rejected change orders are resubmitted under a new identity.

Cover the full scope of the case

Concrete rule
At 499999 and 500000 cents, this fictional workflow requires one authorised approver; at 500001 cents, it requires two distinct approvers. The same person approving twice does not satisfy the rule. Each consent binds the same drawing, scope and cost revision.

Derive storage needs from access patterns

Authoritative relational datastore
A change order has immutable submitted revisions, and several change orders may reference the same drawing revision. The design therefore uses a relational metadata store with uniqueness constraints and short transactions. Historical versions remain referenceable; a rebuildable read model must not overwrite authoritative state.
Large content and measurement series
Immutable files reside in a separate artifact or document store; their hash references become available for approval only after the files are fully stored.

A drawing change creates a new revision requiring review

A drawing change creates a new revision requiring review

A drawing change creates a new revision requiring review.

A new drawing revision and approval both expect version 6. If the drawing change wins, the old approval request is invalidated. If approval wins, it binds the old scope; the new drawing creates a new change order requiring review and leaves the approval unchanged.

Completed change orders receive no cost changes; rejected change orders are resubmitted under a new identity. The exercise specifies the input and expected result.

Alternative considered
Separate unversioned changes allow an older state to overwrite the newer one.
Trade-off
Changes to change order N-32 are serialised briefly.
Reassess
Measurable waits for two approvals and one drawing change on the same change order call for a review of transaction duration.

Try it yourself

Explain the two possible winner orders in the case contract. Also determine the behaviour after terminal completion.

A hint for your attempt

Content revision and aggregate version have different tasks.

Compare with a possible solution
Concurrency
A new drawing revision and approval both expect version 6. If the drawing change wins, the old approval request is invalidated. If approval wins, it binds the old scope; the new drawing creates a new change order requiring review and leaves the approval unchanged.
Completion
Completed change orders receive no cost changes; rejected change orders are resubmitted under a new identity.

Apply to your project

Which states must remain protected in your model against late replay?

Next: the drawing archive remains outside the approval commit.