Critical flow
What evidence remains for the change order after a response is lost, and what may happen next?
Test the architecture at its critical failure point. Approvers confirm a frozen change order. The API checks version and content bindings before commit. Uploading a new drawing after this commit creates a new revision awaiting review; the existing approval remains traceable in history.
Starting point The drawing archive remains outside the approval commit.
Assumptions for the example case
Original fictional design: an internal approval workflow for a change order with frozen drawings and costs. The illustrative internal threshold is 500000 cents. Up to and including this amount, one approver is sufficient; above it, this case requires a second approver. All figures and test targets are illustrative assumptions.
Critical flow with commit and failure point
Critical flow with commit
Approval binds the drawing revision, scope of work and cost revision.
Ordering and failure outcomes
- Required order
- Approvers confirm a frozen change order. The API checks its version and content bindings before commit. Uploading a new drawing after this commit creates a new revision awaiting review; the existing approval remains traceable in history.
- Crash before commit
- No new durable evidence exists yet for change order N-32. The same command may be checked again; unconfirmed intermediate work provides no business guarantee.
- Crash after commit, before response
- The command journal entry records the original result. Identical replay returns that evidence; a fresh view of the current state comes from the read contract.
- External uncertainty
- Without a response from the drawing archive, the outcome remains unknown. Confirmed acceptance, definite rejection and missing evidence have separate states. The responsible domain role investigates using the same reference.
Approval and drawing changes follow a definite order
Approval and drawing changes follow a definite order.
Approvers confirm a frozen change order. The API checks its version and content bindings before commit. Uploading a new drawing after this commit creates a new revision awaiting review; the existing approval remains traceable in history.
Approval binds the exact drawing revision, scope of work and cost revision; every business change creates a new version requiring review. The exercise specifies the input and expected result.
- Alternative considered
- Submitting a new request after a response is lost can execute the same business operation again.
- Trade-off
- Outstanding evidence from the drawing archive requires a worklist.
- Reassess
- Frequent unresolved outcomes require a more reliable contract for external reconciliation.
Try it yourself
Mark the commit point, failure point and next permitted action. Explain the effect of an identical retry.
A hint for your attempt
Trace the same request through the datastore and response path.
Compare with a possible solution
- Flow and failure
- Approvers confirm a frozen change order. The API checks its version and content bindings before commit. Uploading a new drawing after this commit creates a new revision awaiting review; the existing approval remains traceable in history.
- Commit and replay
- The business change and command result are stored together before the response. If the response is lost after commit, read this result. Change order N-32 receives no second effect.
Apply to your project
What feedback could be missing even though the underlying action has already taken place?