Interfaces
How does the Approve forecast contract distinguish a retry from new intent?
The load profile leads to the concrete command “Approve forecast”. Its payload includes interval, model version, input hash and forecast energy. An idempotency key recognises the same intent after a response is lost; an aggregate version protects the changing business state.
Starting point Interval corrections need a separate load profile.
Assumptions for the example case
A fictional example design for a generation facility using fixed 15-minute intervals and separate forecast and measurement versions. Each interval spans 900 seconds, inclusive at the start and exclusive at the end; a measurement at exactly 900 seconds belongs to the next interval. All figures and test targets are illustrative assumptions.
Commands, retries and current state
Command and historical result
Identical replay returns the stored record; changed content produces a conflict.
Proposed API for this example
- POST
/energieprognose/{id}/commandsApprove the forecast
- Input
- Interval, model version, input hash and forecast energy; expected aggregate version, authorised role and stable command key.
- Result
- Durably stored business result and new version; version or content conflicts produce no partial effects. An accepted external request receives an open status.
- Retry behaviour
- The key is scoped to the actor, operation and business object. After authentication, first compare the existing result and canonical content: identical content returns the stored evidence; changed content produces a conflict. Only new keys trigger validation of the current version.
- GET
/energieprognose/{id}Read the current business state and reason for investigation.
- Input
- Authorised identity and business object.
- Result
- Forecast run with its current version, evidence and reason for outstanding processing.
- Retry behaviour
- Repeating a read creates no business change; access is checked again.
Additional state changes
| Operation | Input | Result and protection |
|---|---|---|
| Accept a measurement revision | Facility, interval, source revision, unit and value | The newer revision becomes current; older revisions retain their historical provenance. |
| Comparison | Approved forecast and complete measurement revision | Create a new comparison revision; reuse the result for identical inputs. |
| Complete the comparison | Energy balance team, current comparison revision and validation result | verglichen → abgeschlossen; a later correction creates another comparison revision. |
Accept a measurement revision
- Input
- Facility, interval, source revision, unit and value
- Result and protection
- The newer revision becomes current; older revisions retain their historical provenance.
Comparison
- Input
- Approved forecast and complete measurement revision
- Result and protection
- Create a new comparison revision; reuse the result for identical inputs.
Complete the comparison
- Input
- Energy balance team, current comparison revision and validation result
- Result and protection
- verglichen → abgeschlossen; a later correction creates another comparison revision.
Messages across the external boundary
- Source contract
- ENTSO-E distinguishes published generation, load and other energy data. The learning case uses its own intervals and its own comparative architecture.
- System responsibility
- Accept a new measurement revision durably, then start a new comparison calculation. A late job using an older measurement revision may update the current comparison reference only after a version check; otherwise its result remains historical.
Approval binds the model and input version
Approval binds the model and input version.
Approve forecast may arrive again after a response is lost.
Interval, model version, input hash and forecast energy must remain identical on replay. The exercise specifies the input and expected result.
- Alternative considered
- A key stored only in volatile memory loses its evidence on restart.
- Trade-off
- The journal for Approve forecast requires durable retention and protected access.
- Reassess
- The documented retry window and journal volume determine the future archiving strategy.
Try it yourself
For Approve forecast, predict the outcomes of an identical retry, the same key with changed forecast energy, and a new key with a stale version.
A hint for your attempt
Retry identity and current state require separate checks.
Compare with a possible solution
- Identical
- The saved result for forecast run P-33 is returned; the effect is not repeated.
- Changed
- The same key with altered canonical content results in conflict.
- New intent with a stale version
- A new key with a stale version is rejected before any business change. The interface reloads the current state and asks the user to confirm the decision again.
Apply to your project
Which input fields make two change intentions different in your project?