Data and states
What changes to the forecast run must apply together, and what remains protected after completion?
The contracts require an authoritative datastore for forecast run P-33. Average power of 4 MW over 0.25 hours yields 1 MWh. With a forecast of 1.1 MWh, actual minus forecast is −0.1 MWh. Power in MW and energy in MWh use separate fields and are not added. State and command result are stored together, so the same change request remains recognisable after restart.
Starting point Approval binds the model and input version.
Assumptions for the example case
A fictional example design for a generation facility using fixed 15-minute intervals and separate forecast and measurement versions. Each interval spans 900 seconds, inclusive at the start and exclusive at the end; a measurement at exactly 900 seconds belongs to the next interval. All figures and test targets are illustrative assumptions.
Authoritative data and permitted state transitions
Entities and life cycle
Each comparison binds forecast version, measurement revision and the same interval.
Domain entities and relationships
| Entity | Authoritative attributes | Relationship |
|---|---|---|
| Balance interval | I-33; UTC start and 900 seconds duration | All compared values refer to the same period of time. |
| Forecast run | P-33; model and input version | The forecast is preserved as the result produced at that time. |
| Measurement revision | M-33; source, revision, unit and value | New measurement revision replaces the current view, not the history. |
| Comparison | Forecast, measurement revision and difference in MWh | Multiple comparison revisions can evaluate the same forecast run. |
Balance interval
- Authoritative attributes
- I-33; UTC start and 900 seconds duration
- Relationship
- All compared values refer to the same period of time.
Forecast run
- Authoritative attributes
- P-33; model and input version
- Relationship
- The forecast is preserved as the result produced at that time.
Measurement revision
- Authoritative attributes
- M-33; source, revision, unit and value
- Relationship
- New measurement revision replaces the current view, not the history.
Comparison
- Authoritative attributes
- Forecast, measurement revision and difference in MWh
- Relationship
- Multiple comparison revisions can evaluate the same forecast run.
Permitted state transitions
| Starting point | Target | Precondition |
|---|---|---|
| vorbereitet | berechnet | Input version and model version are recorded. |
| berechnet | freigegeben | Forecasters confirm the run. |
| freigegeben | verglichen | Complete measurement revision of the same interval is present. |
| verglichen | abgeschlossen | The energy balance team confirms the comparison version. |
| vorbereitet or berechnet | verworfen | Incomplete input or calculation errors. |
| abgeschlossen or verworfen | terminal | Corrections create new comparison revisions, not a rewrite of the run. |
vorbereitet
- Target
- berechnet
- Precondition
- Input version and model version are recorded.
berechnet
- Target
- freigegeben
- Precondition
- Forecasters confirm the run.
freigegeben
- Target
- verglichen
- Precondition
- Complete measurement revision of the same interval is present.
verglichen
- Target
- abgeschlossen
- Precondition
- The energy balance team confirms the comparison version.
vorbereitet or berechnet
- Target
- verworfen
- Precondition
- Incomplete input or calculation errors.
abgeschlossen or verworfen
- Target
- terminal
- Precondition
- Corrections create new comparison revisions, not a rewrite of the run.
Atomic changes and versions
- Content reference
- An average power of 4 MW for 0.25 hours gives 1 MWh. For a forecast of 1.1 MWh, actual minus forecast is −0.1 MWh. Power in MW and energy in MWh receive different fields and are not added.
- Shared commit
- The forecast API checks interval, model version, input hash and forecast energy, then writes the business change, command result and any pending work in one transaction. Commit makes these changes durably visible together. Before commit, rollback ends the attempt without partial effects.
- Concurrency
- Measurement revisions 4 and 5 arrive in both orders. The current actual-value view remains at revision 5; the comparison using revision 4 remains available in history.
- Terminal completion
- A new correction to actual measurements does not alter a completed forecast run; it creates a new comparison revision with provenance.
Cover the full scope of the case
- Concrete rule
- Intervals are identified by UTC start and duration. A local daylight-saving display does not change the 900-second duration or energy conversion. Reject values for different facilities or intervals before calculating a difference.
Derive storage needs from access patterns
- Authoritative relational datastore
- All compared values refer to the same interval. The forecast is preserved as the result produced at that time. The design therefore selects a relational metadata store with uniqueness constraints and short transactions. Historical versions remain referenceable; a rebuildable read model must not overwrite authoritative state.
- Large content and measurement series
- Derived views and extensive measurement or event histories are read separately according to their access patterns. Binding state decisions remain in the authoritative datastore.
Corrections extend the comparison history
Corrections extend the comparison history.
Measurement revisions 4 and 5 arrive in both orders. The current actual-value view remains at revision 5; the comparison using revision 4 remains available in history.
A new correction to actual measurements does not alter a completed forecast run; it creates a new comparison revision with provenance. The exercise specifies the input and expected result.
- Alternative considered
- Separate unversioned changes allow an older state to overwrite the newer one.
- Trade-off
- Changes to forecast run P-33 are serialized briefly.
- Reassess
- Measured waiting times for 96 interval corrections from one day at the same facility justify reviewing transaction duration.
Try it yourself
Explain the two possible winner orders in the case contract. Also determine the behaviour after terminal completion.
A hint for your attempt
Content revision and aggregate version have different tasks.
Compare with a possible solution
- Concurrency
- Measurement revisions 4 and 5 arrive in both orders. The current actual-value view remains at revision 5; the comparison using revision 4 remains available in history.
- Completion
- A new correction to actual measurements does not alter a completed forecast run; it creates a new comparison revision with provenance.
Apply to your project
Which states must remain protected in your model against late replay?