Verifiable requirements
Check measurement age and control range together. Which conditions permit authorisation?
60% can be inadmissible when the measurement is stale.
Starting point Explicit control authorisation separates simulation from physical effect.
Assumptions for the example case
A fictional laboratory setup with a ventilation demonstrator. Local hardware limits operate independently; this example replaces neither building automation nor a safety function. All quantities, thresholds and operational targets in this design are illustrative assumptions.
Authorisation windows
Three authorisation checks
Each gate has its own reason for rejection; 20 and 80 percent are included.
Business requirements (functional)
Further reading
- Rule 1
- Simulation never writes directly to the controller.
- Rule 2
- Control authorisation requires a measurement age <30 s, a valid mapping and a setpoint within the inclusive range 20..80 %.
- Rule 3
- An unknown effect remains unresolved; only matching controller confirmation completes the command as Applied.
Quality goals (non-functional)
Further reading
- Measurement window
- 95% of local authorisation checks complete within 300 ms at 20/s over 15 min; measure controller response separately. Reconciliation begins from 5 seconds without a response.
- Open results
- Applied and Not executed require controller evidence; Rejected requires local validation reasons. Building operations retains responsibility for unresolved effects.
Check data age and the permitted control range together.
Age<30 s and 20..80 % must both hold.
60% can be inadmissible when the measurement is stale.
29,999 ms allowed; 30,000 ms rejected. 81% is outside and is rejected despite fresh data.
- Alternative considered
- Checking only the setpoint ignores a stale measurement basis.
- Trade-off
- Current measurements can generate new waiting times.
- Reassess
- Other equipment requires its own limit profiles.
Try it yourself
Check 60% at 29,999 and 30,000 ms and 81% at 10 ms.
A hint for your attempt
60% can be inadmissible when the measurement is stale.
Compare with a possible solution
- Age limit
- 29,999 ms allowed; 30,000 ms rejected.
- Value limit
- 81% is outside and is rejected despite fresh data.
Apply to your project
What is the equivalent of checking data age and control limits together in your project?