Bottlenecks and trade-offs
Investigate a high rejection rate. Which measurements distinguish causes?
Stale data and invalid setpoints look similar in an aggregate counter.
Starting point Querying S-42 resolves the effect.
Assumptions for the example case
A fictional laboratory setup with a ventilation demonstrator. Local hardware limits operate independently; this example replaces neither building automation nor a safety function. All quantities, thresholds and operational targets in this design are illustrative assumptions.
Age or transport
Age, limits or transport
Authorisation rejection and unresolved effects are measured and resolved at different boundaries.
From symptom to targeted action
| Signal | Validation | Action and limit |
|---|---|---|
| Measurement stream | 2,000 sensors /10 s | Process time-series ingestion separately from control authorisation. |
| Raw volume | 200/s ×86,400 s ×100 bytes | Decimal raw volume without indexes; determine retention separately. |
Measurement stream
- Validation
- 2,000 sensors /10 s
- Action and limit
- Process time-series ingestion separately from control authorisation.
Raw volume
- Validation
- 200/s ×86,400 s ×100 bytes
- Action and limit
- Decimal raw volume without indexes; determine retention separately.
Investigate the causes of a high rejection rate.
Measure rejection reasons separately.
Stale data and invalid setpoints look similar in an aggregate counter.
Investigate sensor timestamps, transmission and clock synchronisation. Review the proposal model and limit profile; preserve limits when reducing load.
- Alternative considered
- More workers do not correct invalid setpoints.
- Trade-off
- Additional measurement dimensions require maintenance.
- Reassess
- Dominant transport latency justifies adapter optimization.
Try it yourself
Choose an action when 80% of rejections are due to age and when 80% are due to limit violations.
A hint for your attempt
Stale data and invalid setpoints look similar in an aggregate counter.
Compare with a possible solution
- Age
- Investigate sensor timestamps, transmission and clock synchronisation.
- Boundary
- Review the proposal model and limit profile; preserve limits when reducing load.
Apply to your project
What is the equivalent of diagnosing rejection causes in your project?