Business rules and operational targets
How does an invalid value affect the required exceedance sequence?
The system boundary leads to a domain rule: Investigation must confirm a suspected leak before it becomes a confirmed finding. B-111 has at most one active work order. A repair report requires post-repair inspection before the incident can be closed. An operational target describes a measurable property and begins as a test assumption.
Starting point The control room confirms the cause before issuing a repair order.
Assumptions for the example case
This fictional worked design assumes a bounded metering zone, minute-by-minute flow readings, manual confirmation of findings and one active repair order per confirmed finding. Numbers and quality targets are illustrative test assumptions. Automatic valve control, full hydraulic simulation and drinking water quality assessment are outside scope.
Rules governing the result
Measurement, finding and closure gates
A suspected leak is confirmed manually; one work order is created; the repair stays open until measurement-based verification.
Business requirements (functional)
Further reading
- Invariant
- Investigation must confirm a suspected leak before it becomes a confirmed finding. B-111 has at most one active work order. A repair report requires post-repair inspection before the incident can be closed.
- Boundary test
- Additional flow of 20.00 litres/min does not exceed the threshold; 20.01 does. The sequence 20.01/20.01/20.01 creates a suspected leak; 20.01/invalid/20.01 breaks the sequence and creates none.
- Unresolved outcome
- Field service documents a repair offline and synchronises twice. One work record is created; the order stays in repariert until post-repair inspection provides evidence. Missing measurements after repair leave verification open rather than proving successful restoration.
Quality goals (non-functional)
Further reading
- Local acceptance
- Fictional target: 95% of local administration commands complete within 800 ms under the peak profile: after reconnection, 2,000 × 60 readings in 60 s = 2,000 readings/s. Measure external execution and media transfer separately.
- Traceability
- Every rejected or open operation shows its reason, latest evidenced state and responsible role. Check this in a sample after the failure from step 7.
Require a valid sequence
Reset the three-reading sequence after an invalid minute.
An invalid value lies between two high values.
Only three evidenced threshold exceedances trigger detection.
- Alternative considered
- Skipping invalid values creates false continuity.
- Trade-off
- Brief data gaps delay detection.
- Reassess
- The domain rule is recalibrated.
Terms in this step
- Require a valid sequence
- Only three evidenced threshold exceedances trigger detection.
Try it yourself
Evaluate the sequences 20.01/20.01/20.01 and 20.01/invalid/20.01 litres/min.
A hint for your attempt
Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.
Compare with a possible solution
- First part of the solution
- Three valid exceedances create a suspicion.
- Second part of the solution
- The invalid middle reading breaks the sequence. The second sequence creates no suspected leak under this rule.
Apply to your project
Which corresponding assumption in your project would you check first? Consider this trigger: The domain rule is recalibrated.