System Design Atlas

Agricultural field operations

01 / 10Worked example

Purpose and system boundary

Which decision is reserved for the machine operators despite the approved order on site?

Field F-141 covers 12 ha under boundary version G-4. Operation E-141 assigns machine M-141 to this field from 06:00 to 12:00 UTC. Local work order A-141 permits starting only before 10:00 UTC. Work already started ends according to the local safety decision, no later than the end of the approved window. Scope: mechanical tillage of one field, one machine work order, offline work records, and local checks of the operating window and authorisation.

Starting point Field use involves very different risks.

Assumptions for the example case

Our own fictitious example design: Mechanical tillage of a field; a machine order; offline stored work record; local inspection of operational windows and approval. Figures and quality goals are illustrative test assumptions. Outside are plant protection product application, autonomous driving control, agronomic advice and payroll.

Context and responsibilities

Plan, limited offline order and actual area

Operations planningArea + Machine + Window

Operational responsibility

Planning for deploymentM-141 conflict-free
Working on the groundLocal safety decision
Compare evidence8 ha + 4 ha balance
Machine operatorsPerform work offline
Weather serviceVersioned forecast

A-141 binds machine, time and G-4; the proof of work records the actually processed sub-surface.

Field use involves very different risks. Design mechanical processing with human on-site decision. The contract shall not replace a professional safety assessment.

Assumptions for the worked example

Scope
Mechanical soil treatment of a plot; a machine order; work record stored offline; local inspection of operational windows and release.
Possible extensions
Application of plant protection products, autonomous driving control, agronomic advice and payroll.

Define the mechanical work scope

Define the mechanical work scope

Design mechanical field work around human decisions on site.

Field use involves very different risks.

The contract shall not be a substitute for a professional safety assessment.

Alternative considered
Autonomous execution would need another safety contract.
Trade-off
Planning does not guarantee the start of work.
Reassess
Other types of use will be tested separately.

Terms in this step

Define the mechanical work scope
The contract shall not be a substitute for a professional safety assessment.

Try it yourself

A-141 is present, soil conditions are unsuitable. Who decides and what is documented?

A hint for your attempt

Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.

Compare with a possible solution
First part of the solution
Machine operators make the on-site decision within the agreed mechanical work scope.
Second part of the solution
Start is omitted or work interrupted and documented in a reasoned manner; the plan does not replace a safe execution decision.

Apply to your project

Which corresponding assumption in your project would you check first? Use as an occasion: Other types of use are tested separately.

Step 2: Limit offline authority.