Purpose and system boundary
Which decision is reserved for the machine operators despite the approved order on site?
Field F-141 covers 12 ha under boundary version G-4. Operation E-141 assigns machine M-141 to this field from 06:00 to 12:00 UTC. Local work order A-141 permits starting only before 10:00 UTC. Work already started ends according to the local safety decision, no later than the end of the approved window. Scope: mechanical tillage of one field, one machine work order, offline work records, and local checks of the operating window and authorisation.
Starting point Field use involves very different risks.
Assumptions for the example case
Our own fictitious example design: Mechanical tillage of a field; a machine order; offline stored work record; local inspection of operational windows and approval. Figures and quality goals are illustrative test assumptions. Outside are plant protection product application, autonomous driving control, agronomic advice and payroll.
Context and responsibilities
Plan, limited offline order and actual area
Operational responsibility
A-141 binds machine, time and G-4; the proof of work records the actually processed sub-surface.
Assumptions for the worked example
- Scope
- Mechanical soil treatment of a plot; a machine order; work record stored offline; local inspection of operational windows and release.
- Possible extensions
- Application of plant protection products, autonomous driving control, agronomic advice and payroll.
Define the mechanical work scope
Design mechanical field work around human decisions on site.
Field use involves very different risks.
The contract shall not be a substitute for a professional safety assessment.
- Alternative considered
- Autonomous execution would need another safety contract.
- Trade-off
- Planning does not guarantee the start of work.
- Reassess
- Other types of use will be tested separately.
Terms in this step
- Define the mechanical work scope
- The contract shall not be a substitute for a professional safety assessment.
Try it yourself
A-141 is present, soil conditions are unsuitable. Who decides and what is documented?
A hint for your attempt
Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.
Compare with a possible solution
- First part of the solution
- Machine operators make the on-site decision within the agreed mechanical work scope.
- Second part of the solution
- Start is omitted or work interrupted and documented in a reasoned manner; the plan does not replace a safe execution decision.
Apply to your project
Which corresponding assumption in your project would you check first? Use as an occasion: Other types of use are tested separately.