Design and evidence
Which tests verify the local start deadline and exactly-once acceptance of completed area?
The final design reuses the complete runtime topology from step 6. Test markers connect key decisions to expected results and earlier steps to revisit. The following items form a test plan; measured evidence is still outstanding.
Starting point Track receipt and deadline expiry as separate completion paths.
Assumptions for the example case
Our own fictitious example design: Mechanical tillage of a field; a machine order; offline stored work record; local inspection of operational windows and approval. Figures and quality goals are illustrative test assumptions. Outside are plant protection product application, autonomous driving control, agronomic advice and payroll.
Overall architecture with evidence
Runtime architecture · central planning, local journal
- 1 · Confirm the operation
- 2 · Take over local order
- 3 · Journaling work
- 4 · Reconcile the remaining area
Agricultural Platform
Machine operators decide on safe operation on site; the app holds the work order and journal; the gateway accepts evidence; planning and work records share the operations store.
Test plan with review loops
| Validation | Expected result | Return to an earlier step |
|---|---|---|
| Concurrency in both orders | Two plans request M-141 for overlapping time windows. Exactly one wins in either commit order. For central revocation versus an offline start, possible start authority remains visible until 10:00 unless receipt is confirmed; the central interface must not claim that revocation took immediate effect. | Steps 3 and 5 |
| Identical and changed retries | The same work record over 5 ha with the same device event is synchronized twice: 5 ha, not 10 ha. The same key with 6 ha creates conflict. Changed field boundary does not replace G-4 in the old proof. | Step 4 |
| Exact value or time limit | Start of work 09:59:59.999 UTC is allowed under valid A-141;10:00:00.000 and thereafter are too late. Order with missing or uncheckable time is clarified on site instead of started automatically. | Steps 2 and 5 |
| Lost response and restart | Machine operators complete 8 ha offline. The server accepts the record, but its response is lost. A retry confirms 8 ha. The remaining 4 ha stays visible for planning; the operation is not presented as a fully completed 12 ha. | Steps 7 and 9 |
Concurrency in both orders
- Expected result
- Two plans request M-141 for overlapping time windows. Exactly one wins in either commit order. For central revocation versus an offline start, possible start authority remains visible until 10:00 unless receipt is confirmed; the central interface must not claim that revocation took immediate effect.
- Return to an earlier step
- Steps 3 and 5
Identical and changed retries
- Expected result
- The same work record over 5 ha with the same device event is synchronized twice: 5 ha, not 10 ha. The same key with 6 ha creates conflict. Changed field boundary does not replace G-4 in the old proof.
- Return to an earlier step
- Step 4
Exact value or time limit
- Expected result
- Start of work 09:59:59.999 UTC is allowed under valid A-141;10:00:00.000 and thereafter are too late. Order with missing or uncheckable time is clarified on site instead of started automatically.
- Return to an earlier step
- Steps 2 and 5
Lost response and restart
- Expected result
- Machine operators complete 8 ha offline. The server accepts the record, but its response is lost. A retry confirms 8 ha. The remaining 4 ha stays visible for planning; the operation is not presented as a fully completed 12 ha.
- Return to an earlier step
- Steps 7 and 9
First end-to-end validation
- End-to-end path
- Start A-141 offline, report 8 ha and lose the response. 8 ha are counted once, 4 ha remain open and later starts are blocked.
- Open decision
- After that, several sub-areas and machines are supplemented. Application of plant protection products, autonomous driving control, agronomic advice and payroll require their own follow-up design.
Test the offline boundary
Start A-141 offline, report 8 ha and lose the response.
The critical process connects deadline and sub-area.
8 ha remain one-time,4 ha open, later starts blocked.
- Alternative considered
- A map test does not verify authority.
- Trade-off
- Test requires local clock and separate device storage.
- Reassess
- After that, several sub-areas and machines are supplemented.
Terms in this step
- Test the offline boundary
- 8 ha remain one-time,4 ha open, later starts blocked.
Try it yourself
Assign the start deadline and duplicate sub-area report to a test and a design step to revisit.
A hint for your attempt
Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.
Compare with a possible solution
- First part of the solution
- Starting at 09:59:59.999 is allowed; exactly 10 o’clock is rejected. Failures lead back to step 2/5.
- Second part of the solution
- Eight-ha receipt twice: eight confirmed, four open; error to step 4/7. Both commitments must remain traceable offline.
Apply to your project
Which corresponding assumption in your project would you check first? Use as an occasion: After that, several sub-areas and machines are supplemented.
Start your own design
Choose a small case from your project. The template collects the ten design tasks and leaves space for your sketches, decisions, and open assumptions. You can edit it in your text editor or note-taking app.
Download design template (.md)Compare the ten tasks with the example case
Purpose and boundary
Which corresponding assumption in your project would you check first? Use as an occasion: Other types of use are tested separately.
In the example: Design mechanical field work around human decisions on site. A work order does not replace a professional safety assessment.
Requirements
Which corresponding assumption in your project would you check first? Use as an occasion: Shorter operating windows are necessary for operation.
In the example: Track the start deadline and receipt acknowledgement explicitly. The central system knows what effects remain possible.
Scale estimates
Which corresponding assumption in your project would you check first? Use as an occasion: Longer periods without connectivity increase the amount.
In the example: Test 768 measurements/s as a catch-up profile. The offline buffer dominates recovery.
Interfaces
Which corresponding assumption in your project would you check first? Use as an occasion: Device change changes sequence contract.
In the example: Compare the device sequence and content together. The area is counted once.
Data and states
Which corresponding assumption in your project would you check first? Use as an occasion: Retention requires a limited archive strategy.
In the example: Bind the work record to G-4. The area worked at the time remains explainable.
Overall architecture
Which corresponding assumption in your project would you check first? Use as an occasion: connection becomes reliable and boundaries change.
In the example: Keep the complete work order and journal locally. Starting and recording work function within the authorised scope.
Critical flow
Which corresponding assumption in your project would you check first? Use as an occasion: partial areas are removed geometrically instead of quantity-related.
In the example: Confirm 8 ha and leave 4 ha open. The plan is not presented as work actually performed.
Bottlenecks and trade-offs
Which corresponding assumption in your project would you check first? Use as an occasion: Better local measurement becomes available.
In the example: Keep creation time and spatial references visible. Operators recognise the limited reliability of the forecast.
Operations and security
Which corresponding assumption in your project would you check first? Use as an occasion: A verified local stop channel is added.
In the example: Track receipt and deadline expiry as separate completion paths. Farm management knows whether starting is still possible.
Final design
Which corresponding assumption in your project would you check first? Use as an occasion: After that, several sub-areas and machines are supplemented.
In the example: Start A-141 offline, report 8 ha and lose the response. 8 ha are counted once, 4 ha remain open and later starts are blocked.