Agricultural field operations

06 / 10Worked example

The overall architecture

Which data enables a limited use without a running connection?

This runtime topology follows from the data contract: Planning interface → field-operations API → operations and geometry store. Machine app with local job and event journal ↔ Synchronization gateway → Evidence validation → same operations store. Weather Import → Versioned Forecast store → Planning View. Local machine operation and safety decision remain outside the platform control. Internal modules are domain code boundaries; on the other hand, a separate process has its own operational lifecycle.

Starting point Bind the work record to G-4.

Assumptions for the example case

Our own fictitious example design: Mechanical tillage of a field; a machine order; offline stored work record; local inspection of operational windows and approval. Figures and quality goals are illustrative test assumptions. Outside are plant protection product application, autonomous driving control, agronomic advice and payroll.

Runtime architecture

Runtime architecture · central planning, local journal

Scheduling interfaceOperation + remaining area
Machine appWork order + event journal

Agricultural Platform

Operational APIPlan adoption
Operations and geometry storeE-141 · G-4 · Evidence
Synchronization gatewayOffline events
Evidence verificationMachine + boundary + area
Weather importAdopt forecasts
Forecast storeVersion + spatial reference
Weather serviceForecast
Planning interface → Field-operations APIPlan + G-4
Field-operations API → Operations and geometry storeE-141
Machine app → synchronization gatewaylocal event journal
Synchronization gateway → Evidence validationWork record
Evidence validation → Operations and geometry store8 ha + G-4 + M-141
Weather Service → Weather ImportForecast
Weather import → Forecast storeVersioned state
Forecast store → Planning interfacePlanning guidance
Synchronization gateway → machine appconfirmation / order

Machine operators decide on safe operation on site; the app holds the work order and journal; the gateway accepts evidence; planning and work records share the operations store.

Field does not have a stable connection. Keep full order and journal local. Start and proof work in the released framework.

Domain modules within the application

Inside the field-operations process · five domain modules

Field boundary versionG-4 holding
Machine planningPreventing overlap
Offline orderLimit authority to start work
Work recordTake over the partial area once
Remaining-area reviewContinue planning for 4 ha

The field boundary version and machine schedule constrain the work order; the offline order, work record and remaining-area review track actual work.

Field boundary version preserves boundaries and the plan reference. Machine planning prevents overlapping assignments. Offline order limits local start authority. Work record accepts actual completed sub-areas once. Remaining-area review connects interruptions to follow-up planning.

Operational boundaries

Runtime
Planning interface → field-operations API → operations and geometry store. Machine app with local work order and event journal ↔ synchronization gateway → evidence validation → the same operations store. Weather import → versioned forecast store → planning view. Local machine control and safety decisions remain outside the platform’s control.
Persistence
Transactional store for area F-141, operation E-141, order A-141. Authoritative changes and their retry result are stored together; external side effects require their own proof.

Keep local operations functional

Keep local operations functional

Keep the complete work order and journal locally.

Field does not have a stable connection.

Starting work and recording evidence remain possible within the approved scope.

Alternative considered
Online checking before each step stops the use.
Trade-off
Offline conflicts will be resolved later.
Reassess
Connection becomes reliable and boundaries change.

Terms in this step

Keep local operations functional
Starting work and recording evidence remain possible within the approved scope.

Try it yourself

Which data must be stored on the device before connectivity is lost so A-141 remains executable within its limits?

A hint for your attempt

Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.

Compare with a possible solution
First part of the solution
Full released order with machine, activity, G-4, time window and start deadline.
Second part of the solution
A local permanent event journal records the start and actual work until synchronization; new central changes are not yet received.

Apply to your project

Which corresponding assumption in your project would you check first? Use as an occasion: connection becomes reliable and boundaries change.

Step 7: Record the area actually completed.