02 / 10Worked example

Business rules and operational targets

When is a central revocation effective on an offline device?

The system boundary leads to a business rule: a work record remains bound to the area boundary and machine actually used. A central revocation is only effective offline after device confirmation or expiry of the start-authorisation period. Actual area is not replaced by planned area. An operating goal, on the other hand, describes a measurable property and is initially a test assumption.

Starting point Design mechanical field work around human decisions on site.

Assumptions for the example case

Our own fictitious example design: Mechanical tillage of a field; a machine order; offline stored work record; local inspection of operational windows and approval. Figures and quality goals are illustrative test assumptions. Outside are plant protection product application, autonomous driving control, agronomic advice and payroll.

Rules governing the result

Boundary version, machine and authority to start

Geometry gatesF-141 · G-4
Machine gatesM-141 exclusive
Start gatebefore 10:00 UTC
8 ha offline → MaschinenpersonalRepeat event journal; 4 ha open

The proof remains bound to G-4 and M-141; a revocation is only effective locally by receipt or deadline.

Central revocation does not reach the device. The start deadline and the acknowledgement of receipt are expressly required. Central knows the remaining possible effect.

Business requirements (functional)

Further reading
Invariant
A work record remains bound to the field boundary and machine actually used. Central revocation ends offline authority to start work only after device acknowledgement or expiry of the start deadline. The area actually worked is not replaced by the planned area.
Boundary test
Start of work 09:59:59.999 UTC is allowed under valid A-141;10:00:00.000 and thereafter are too late. Order with missing or uncheckable time is clarified on site instead of started automatically.
Unresolved outcome
Machine operators complete 8 ha offline. The server accepts the record, but its response is lost. A retry confirms 8 ha. The remaining 4 ha stays visible for planning; the operation is not presented as a fully completed 12 ha.

Quality goals (non-functional)

Further reading
Local acceptance
Fictitious target: 95% of local administration commands within 800 ms in the peak-load profile Catch-up after 8 hours:80 × 5,760 = 460,800 values; in 600 s = 768 values/s. External execution and media transfer shall be measured separately.
Traceability
Every rejected or open operation shows its reason, latest evidenced state and responsible role. Check this in a sample after the failure from step 7.

Limit offline authority

Limit offline authority

Track the start deadline and receipt acknowledgement explicitly.

Central revocation does not reach the device.

Central knows the remaining possible effect.

Alternative considered
Revocations at the headquarters alone simulate control.
Trade-off
Power may continue until the time limit.
Reassess
Shorter operational windows are necessary.

Terms in this step

Limit offline authority
Central knows the remaining possible effect.

Try it yourself

The control center revokes A-141 when the device is offline. When is the starting authority safely ended?

A hint for your attempt

Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.

Compare with a possible solution
First part of the solution
Acknowledged receipt of revocation before work starts ends the authority immediately under the local contract.
Second part of the solution
Without receipt evidence, a possible start remains visible until the start deadline. Its expiry reliably blocks new starts.

Apply to your project

Which corresponding assumption in your project would you check first? Use as an occasion: Shorter operating windows are necessary for operation.

Step 3: Calculate catch-up volume.