System Design Atlas

Agricultural field operations

04 / 10Worked example

Change commands and retries

How are repeated and corrected partial area messages distinguished?

Scale alone does not ensure consistent retry behaviour. This proposed API binds the role, business object, change payload and expected state to each new intent. An idempotency key identifies the same intent after a response is lost.

Starting point Test 768 measurements/s as a catch-up profile.

Assumptions for the example case

Our own fictitious example design: Mechanical tillage of a field; a machine order; offline stored work record; local inspection of operational windows and approval. Figures and quality goals are illustrative test assumptions. Outside are plant protection product application, autonomous driving control, agronomic advice and payroll.

Retries and new intent

Offline job and device event

Work recordeventKey · 5 ha · G-4 · M-141
Arbeitsnachweis → NachweisregisterIdentical / changed / new
Record of evidenceHistorical evidence
is equal to 5 ha6 ha → conflictNew boundary → new reference

The event key deduplicates 5 ha; a change to 6 ha collides and the old proof retains G-4.

One device repeats 5 ha. Compare device sequence and content together. Area counts once.

Proposed domain API contracts

  1. POST/field-operations

    Assign machine and field.

    Input
    Operations planning, F-141, G-4, M-141, activity, time window [06:00,12:00) UTC, start deadline 10:00 and key.
    Result
    E-141 with conflict-free machine binding and complete A-141.
    Retry behaviour
    An identical operation by the same authorised role on the same object, using the same key and canonical payload, returns the stored original result. A changed payload under that key is rejected. External result identifiers are durably deduplicated after authentication; new intents check the current version again.
  2. POST/field-operations/{id}/acknowledgements

    Acknowledge local receipt or revocation.

    Input
    Authenticated device,A-141,E-141, order digest, event identifier and reception mode.
    Result
    Permanent receipt; only documented withdrawal receipt ends local authority safely before deadline.
    Retry behaviour
    An identical operation by the same authorised role on the same object, using the same key and canonical payload, returns the stored original result. A changed payload under that key is rejected. External result identifiers are durably deduplicated after authentication; new intents check the current version again.
  3. POST/field-operations/{id}/work-evidence

    Report actual offline work.

    Input
    Machine operators, device sequence, A-141, G-4, M-141, start time, end time, 8 ha and work record.
    Result
    A proof of 8 ha,4 ha remain open; altered content under the same key generates conflict.
    Retry behaviour
    An identical operation by the same authorised role on the same object, using the same key and canonical payload, returns the stored original result. A changed payload under that key is rejected. External result identifiers are durably deduplicated after authentication; new intents check the current version again.
  4. GET/field-operations/{id}

    Read plan, authority and actual status.

    Input
    Eligible operations planning or machine operators,E-141.
    Result
    Work order version, receipt acknowledgement, start deadline, work records and remaining area.
    Retry behaviour
    Repeating a read creates no business effect; the returned current state may change between requests.

Keep evidence content stable

Keep evidence content stable

Compare the device sequence and content together.

One device repeats 5 ha.

Area counts once.

Alternative considered
Only timestamps confuse correction and repetition.
Trade-off
Correction needs its own proof.
Reassess
Device change changes sequence contract.

Terms in this step

Keep evidence content stable
Area counts once.

Try it yourself

The same device receipt reports five ha twice and then six ha. Define takeover and conflict.

A hint for your attempt

Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.

Compare with a possible solution
First part of the solution
The same repetition counts a total of five ha.
Second part of the solution
Six ha under the same event identity creates conflict. A real correction needs its own referenced proof.

Apply to your project

Which corresponding assumption in your project would you check first? Use as an occasion: Device change changes sequence contract.

Step 5: Preserve the field boundary version.