Authoritative data and states
Which area limit remains relevant for a historical work record?
The interfaces require an authoritative state. A work record remains tied to the actual area boundary and machine used. A central revocation is only effective offline after device confirmation or expiry of the start-authorisation period. Actual area is not replaced by planned area. The following table separates current states from the evidence of their formation.
Starting point Compare the device sequence and content together.
Assumptions for the example case
Our own fictitious example design: Mechanical tillage of a field; a machine order; offline stored work record; local inspection of operational windows and approval. Figures and quality goals are illustrative test assumptions. Outside are plant protection product application, autonomous driving control, agronomic advice and payroll.
Data relationships and permitted transitions
Planned polygon, travelled track and remaining area
The plan covers 12 ha in G-4; the documented track covers 8 ha; the remaining 4 ha needs separate planning.
Entities and relationships
| Entity | Authoritative data | Responsibility |
|---|---|---|
| Area F-141 | 12 ha, boundary version G-4 | Geometry is versioned. |
| Operation E-141 | Machine, activity, time window | Combines planning and actual work. |
| Order A-141 | Signed content, start deadline, device allocation | A bounded work authorisation usable offline. |
| Work record | Device, sequence, sub-area, start, end | Describes actual work. |
| Weather forecast | Creation time, area, values | Planning assistance; on-site inspection remains necessary. |
Area F-141
- Authoritative data
- 12 ha, boundary version G-4
- Responsibility
- Geometry is versioned.
Operation E-141
- Authoritative data
- Machine, activity, time window
- Responsibility
- Combines planning and actual work.
Order A-141
- Authoritative data
- Signed content, start deadline, device allocation
- Responsibility
- A bounded work authorisation usable offline.
Work record
- Authoritative data
- Device, sequence, sub-area, start, end
- Responsibility
- Describes actual work.
Weather forecast
- Authoritative data
- Creation time, area, values
- Responsibility
- Planning assistance; on-site inspection remains necessary.
Permitted state transitions
| Starting point | Target | Condition |
|---|---|---|
| geplant | freigegeben | Machine and field assigned without conflict. |
| freigegeben | Local_Acquired | The device stores a complete order. |
| Local_Acquired | Started | Staff shall confirm on-site inspection before the start deadline. |
| Started | unterbrochen | Conditions prevent safe continuation. |
| Started or interrupted | arbeit_beendet | The area actually worked is documented. |
| arbeit_beendet | abgeglichen | Central checks evidence and open remaining area. |
| freigegeben | widerrufen | Device confirms revocation before the start; without confirmation, the start option remains visible as a risk until the deadline. |
geplant
- Target
- freigegeben
- Condition
- Machine and field assigned without conflict.
freigegeben
- Target
- Local_Acquired
- Condition
- The device stores a complete order.
Local_Acquired
- Target
- Started
- Condition
- Staff shall confirm on-site inspection before the start deadline.
Started
- Target
- unterbrochen
- Condition
- Conditions prevent safe continuation.
Started or interrupted
- Target
- arbeit_beendet
- Condition
- The area actually worked is documented.
arbeit_beendet
- Target
- abgeglichen
- Condition
- Central checks evidence and open remaining area.
freigegeben
- Target
- widerrufen
- Condition
- Device confirms revocation before the start; without confirmation, the start option remains visible as a risk until the deadline.
Preserve the field boundary version
Bind the work record to G-4.
The planned field area will be remeasured later.
The area worked at that time remains explainable.
- Alternative considered
- Applying current geometry retroactively would misrepresent the work performed.
- Trade-off
- Several borders remain stored.
- Reassess
- Retention requires limited archive strategy.
Terms in this step
- Preserve the field boundary version
- The area worked at that time remains explainable.
Try it yourself
F-141 is surveyed again after the operation. Which geometry explains the historical work record?
A hint for your attempt
Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.
Compare with a possible solution
- First part of the solution
- The proof remains bound to G-4, because this limit applied during use.
- Second part of the solution
- The new boundary version applies to new planning and does not overwrite the historical area allocation.
Apply to your project
Which corresponding assumption in your project would you check first? Use as an occasion: Retention requires a limited archive strategy.