Agricultural field operations

03 / 10Worked example

Scale and contention

Which catch-up profile results after eight hours without connection?

The requirements are tested under a concrete, fictitious scale: 80 machines with 1 position value per 5 s. Mean, peak and contention are considered separately.

Starting point Track the start deadline and receipt acknowledgement explicitly.

Assumptions for the example case

Our own fictitious example design: Mechanical tillage of a field; a machine order; offline stored work record; local inspection of operational windows and approval. Figures and quality goals are illustrative test assumptions. Outside are plant protection product application, autonomous driving control, agronomic advice and payroll.

Throughput and the contended resource

Position stream and offline catch-up

80 ÷ 5 s = 16/s460,800 ÷ 600 s = 768/s12 ha - 8 ha = 4 ha balance
Plan E-141M-141 · 06–12
Machine calendarOne winner
Further operational planOverlapping

16 values/s are normal operation; 768 values/s load the synchronization after eight offline hours.

80 machines synchronize after 8 hours. Check 768 values/s as a catch-up profile. Offline buffer dominates the restart.

Reproducible test profile calculations

  1. 01

    Average load

    80 machines with 1 position value per 5 seconds

    80 ÷ 5 s = 16 position values/s

    For the designThe rate describes the assumed total volume; response time still requires measurement.

  2. 02

    Peak test

    Catch-up after 8 hours: 80 × 5,760 = 460,800 values; in 600 s = 768 values/s

    12 ha plan − 8 ha proven = 4 ha open remaining area

    For the designThe additional quantity calculation defines a separate check of resource or retention needs.

Test concurrency separately

Test oracle
Two plans request M-141 for overlapping time windows. Exactly one wins in either commit order. For central revocation versus an offline start, possible start authority remains visible until 10:00 unless receipt is confirmed; the central interface must not claim that revocation took immediate effect.

Calculate catch-up volume

Calculate catch-up volume

Test 768 measurements/s as a catch-up profile.

80 machines synchronize after 8 hours.

Offline buffer dominates the restart.

Alternative considered
16 values/s normal rate is not sufficient as a test.
Trade-off
Devices need local storage.
Reassess
Longer periods without connectivity increase the amount.

Terms in this step

Calculate catch-up volume
Offline buffer dominates the restart.

Try it yourself

Calculate the delivery volume and rate after eight offline hours for 80 machines.

A hint for your attempt

Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.

Compare with a possible solution
First part of the solution
Each machine produces 8 × 3,600 ÷ five = 5,760 values; together they produce 460,800.
Second part of the solution
Over 600 seconds, this is 768 values/s. The normal rate of 16/s does not replace this restart profile.

Apply to your project

Which corresponding assumption in your project would you check first? Use as an occasion: Longer periods without connectivity increase the amount.

Step 4: Keep evidence content stable.