System Design Atlas

Agricultural field operations

08 / 10Worked example

Investigating bottlenecks

What time does the timeliness of a weather forecast describe?

The failure sequence shows where load and retries interact. The diagnostic plan treats measured waiting time, processing duration and business conflicts separately.

Starting point Confirm 8 ha and leave 4 ha open.

Assumptions for the example case

Our own fictitious example design: Mechanical tillage of a field; a machine order; offline stored work record; local inspection of operational windows and approval. Figures and quality goals are illustrative test assumptions. Outside are plant protection product application, autonomous driving control, agronomic advice and payroll.

Diagnose the limiting resource

Synchronization wave and machine conflict

Catch-up synchronization768 values/s
Sync ageMeasure queue depth
Dual planningM-141
Planning conflictOne winner

768 values/s explain a technical backlog; two overlapping plans explain a domain rejection.

New display contains old weather forecast. Keep the creation time and spatial reference visible. The staff recognizes limited significance.

From signal to action

SignalValidationReaction
Display forecast ageNew display contains old weather forecast.Keep creation time and spatial references visible.
Conflicts on the shared entityTwo plans request M-141 for overlapping time windows. Exactly one wins in either commit order. For central revocation versus an offline start, possible start authority remains visible until 10:00 unless receipt is confirmed; the central interface must not claim that revocation took immediate effect.Count expected conflicts separately from technical errors.
Peak test profile exceededCatch-up after 8 hours: 80 × 5,760 = 460,800 values; in 600 s = 768 values/sBetter local measurement will become available.

Display forecast age

Validation
New display contains old weather forecast.
Reaction
Keep creation time and spatial references visible.

Conflicts on the shared entity

Validation
Two plans request M-141 for overlapping time windows. Exactly one wins in either commit order. For central revocation versus an offline start, possible start authority remains visible until 10:00 unless receipt is confirmed; the central interface must not claim that revocation took immediate effect.
Reaction
Count expected conflicts separately from technical errors.

Peak test profile exceeded

Validation
Catch-up after 8 hours: 80 × 5,760 = 460,800 values; in 600 s = 768 values/s
Reaction
Better local measurement will become available.

Display forecast age

Display forecast age

Keep creation time and spatial references visible.

New display contains old weather forecast.

The staff recognizes limited significance.

Alternative considered
Showing only retrieval time implies that the forecast is current.
Trade-off
On-site inspection remains necessary.
Reassess
Better local measurement will become available.

Terms in this step

Display forecast age
The staff recognizes limited significance.

Try it yourself

A forecast retrieved just now was created several hours ago. Which timestamps must the display distinguish?

A hint for your attempt

Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.

Compare with a possible solution
First part of the solution
Retrieval time describes technical reception; creation time and area describe the forecast.
Second part of the solution
The old forecast is not issued as new. Machine operators continue to check conditions on site themselves.

Apply to your project

Which corresponding assumption in your project would you check first? Use as an occasion: Better local measurement becomes available.

Step 9: Track revocation.