Business rules and operational targets
How do confirmed instruction acceptance and proven plant effect differ?
The system boundary establishes these domain rules: only the latest valid control command may take effect within its time window. Local equipment limits take priority. Acknowledgement of receipt does not prove actual kW delivery. An operational target describes a measurable property and initially remains a test assumption.
Starting point Enforce equipment limits and safe fallback behaviour locally.
Assumptions for the example case
A fictional design with controllable equipment and an agreed power range; 15-minute dispatch; UTC time windows; local safety limits and measured effects. Figures and quality targets are illustrative test assumptions. Protection systems, primary frequency control, market bids and evidence of specific energy-regulation compliance remain outside its scope.
Rules governing the result
Effect checks · generation, time window, local limits and measurement quality
Confirmation lost: query C-81. At expiry, the local safe fallback rule takes over.
A receipt confirms acceptance; a fresh measurement is needed to evidence delivered kW.
Business requirements (functional)
Further reading
- Invariant
- Only the newest valid control command may take effect within its time window. Local equipment limits take precedence. An acknowledgement does not establish delivered kW.
- Boundary test
- Measurement ages of 29,999 and 30,000 ms permit new dispatch; 30,001 ms is stale. C-81 is valid at 12:14:59.999 and expires at 12:15:00.000, when the local safe fallback rule takes over.
- Unresolved outcome
- Equipment control accepts C-81 but its acknowledgement is lost. Dispatchers show acceptance unknown and query the same command. Even after confirmed acceptance, the effect remains unknown without valid measurements; expiry activates the local safe fallback rule.
Quality goals (non-functional)
Further reading
- Local acceptance
- Fictional target: 95% of local management commands within 800 ms during simultaneous dispatch to 1,000 devices in 10 s = 100 commands/s. Measure external execution and transmission separately.
- Traceability
- Every rejected or open operation shows its reason, latest evidenced state and responsible role. Check this in a sample after the failure from step 7.
Separate acceptance from effect
Track acknowledgements and measurement evidence separately.
A command is acknowledged, the performance remains the same.
20 kW requested is not 20 kW provided.
- Alternative considered
- Treating acknowledgement as success falsely claims an effect.
- Trade-off
- Disposition indicates an additional open state.
- Reassess
- A robust local proof of efficacy will become available.
Terms in this step
- Separate acceptance from effect
- 20 kW requested is not 20 kW provided.
Try it yourself
The system acknowledges 20 kW, measurement is missing. Select two separate status statements.
A hint for your attempt
Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.
Compare with a possible solution
- First part of the solution
- Acceptance of the control command is confirmed.
- Second part of the solution
- The actual effect remains unknown. A receipt is not proof of a reduction.
Apply to your project
Which corresponding assumption would you check first in your project when reliable local evidence of effect becomes available?