The overall architecture
How does the architecture connect control path and measurement feedback?
The data contract leads to this topology: grid operations → dispatch API → dispatch and availability store. Transmission worker → secured equipment adapter → local equipment control. Measurement ingestion → time-series store → effect assessment, which writes evidence back to the dispatch. Local safety logic stays outside the platform boundary and operates without connectivity. Domain modules are code boundaries; separate processes have their own operational lifecycle.
Starting point Check overlapping commitments against availability atomically.
Assumptions for the example case
A fictional design with controllable equipment and an agreed power range; 15-minute dispatch; UTC time windows; local safety limits and measured effects. Figures and quality targets are illustrative test assumptions. Protection systems, primary frequency control, market bids and evidence of specific energy-regulation compliance remain outside its scope.
Runtime architecture
Runtime architecture · platform control and local safety boundary
Flexibility platform
The platform transmits time-limited commands; local safety logic works even without a connection.
Domain modules within the application
Inside dispatch · five domain modules
The control contract assigns a generation and expiry; effect assessment remains separate from evidence of acceptance.
Operational boundaries
- Runtime
- Grid operations → dispatch API → dispatch and availability store. Transmission worker → secured equipment adapter → local equipment control. Measurement ingestion → time-series store → effect assessment, which writes evidence back to the dispatch. Local safety logic stays outside the platform boundary and operates without connectivity.
- Persistence
- Transactional store for equipment A-81, dispatch F-81 and control command C-81. Authoritative changes and retry results commit together; external effects require separate evidence.
Keep the measurement path separate
Connect time series and dispatch state through explicit feedback.
Measurements are common, control orders rare.
Measurement load does not block every dispatch change.
- Alternative considered
- One unstructured event collection makes evidence harder to trace.
- Trade-off
- Two data sets need explicit assignment.
- Reassess
- Measuring volumes or detection rules change.
Terms in this step
- Keep the measurement path separate
- Measurement load does not block every dispatch change.
Try it yourself
Draw the control path and measurement feedback; indicate the external safety responsibility.
A hint for your attempt
Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.
Compare with a possible solution
- First part of the solution
- The dispatch API and worker send C-81 through the equipment adapter to local control.
- Second part of the solution
- Measurement ingestion, time series and effect assessment return the evidence. Local safety logic stays at the equipment, outside the platform's authority.
Apply to your project
Which corresponding assumption would you check first in your project when measurement volume or evidence rules change?