System Design Atlas

Electricity grid flexibility dispatch

03 / 10Worked example

Scale and contention

Which energy corresponds to a twenty kilowatt reduction over a quarter of an hour?

The requirements are tested under a concrete, fictitious scale: 1,000 plants with a measured value every 10 s. Mean, peak and contention are considered separately.

Starting point Track acknowledgements and measurement evidence separately.

Assumptions for the example case

A fictional design with controllable equipment and an agreed power range; 15-minute dispatch; UTC time windows; local safety limits and measured effects. Figures and quality targets are illustrative test assumptions. Protection systems, primary frequency control, market bids and evidence of specific energy-regulation compliance remain outside its scope.

Throughput and the contended resource

Measurements, command burst and requested energy

1,000 / 10 s100 measurements/s
1,000 / 10 s100 commands/s
20 kW × 0.25 h5 kWh requested
50 kW is available
30 kWFirst reservation
40 kWSecond reservation conflicts

100 measurements/s and 100 commands/s use different paths; 5 kWh remains requested energy until measurements evidence delivery.

A call takes 15 minutes. Multiply 20 kW by 0.25 h to 5 kWh. The desired value is given a testable time dimension.

Reproducible test profile calculations

  1. 01

    Average load

    1,000 plants with a measured value every 10 s

    1000 ÷ 10 s = 100 measured values/s

    For the designThe rate describes the assumed total volume; response time still requires measurement.

  2. 02

    Peak test

    Simultaneous retrieval of 1,000 plants in 10 s = 100 orders/s

    20 kW × 0.25 h = 5 kWh of requested energy reduction; delivered energy still requires evidence.

    For the designThe additional quantity calculation defines a separate check of resource or retention needs.

Test concurrency separately

Test oracle
Two dispatchers concurrently request 30 and 40 kW from 50 kW of available flexibility. In either commit order, only the first reservation succeeds; the second conflicts. A newer generation replaces an older one only after an explicit replacement decision.

Calculate power and energy

Calculate power and energy

Multiply 20 kW by 0.25 h to obtain 5 kWh.

A call takes 15 minutes.

The desired value is given a testable time dimension.

Alternative considered
Equating kW with kWh produces an incorrect energy balance.
Trade-off
Actual effect requires an agreed comparison rule as well.
Reassess
Billing requires a separate baseline.

Terms in this step

Calculate power and energy
The desired value is given a testable time dimension.

Try it yourself

Convert 20 kW into energy over 15 minutes and state the missing proof.

A hint for your attempt

Use the specific entities and conditions from this step. The two solution parts distinguish the decision from its evidenced outcome.

Compare with a possible solution
First part of the solution
15 minutes is 0.25 hours; 20 kW times 0.25 h gives 5 kWh of required reduction energy.
Second part of the solution
Delivered energy requires valid measurements and an agreed comparison rule; the target calculation alone does not establish an effect.

Apply to your project

Which corresponding assumption would you check first in your project when billing requires a separate baseline?

Step 4 examines: time-limit commands.